The following route will be chosen for the further project process, because <strong>of</strong> the size and relevance <strong>of</strong><br />

<strong>transport</strong> potentials, because <strong>of</strong> the far developed project status <strong>of</strong> the pilot trains, developed by the<br />

TRANSITECTS partners RVDI and ALOT and because <strong>of</strong> the high interest shown by terminal operators<br />

and train operators: Beginning in <strong>Berlin</strong>-Grossbeeren (Transhipment terminal), with partly stopping at the<br />

transhipment terminal Nuremberg Bavaria port (with connection to the pilot train Nuremberg – Mantua),<br />

going to the transhipment terminal Ulm-Domstadt (connection to the pilot trains Ulm – Melzo) and returning.<br />

The parameters <strong>of</strong> the pilot train are shown in the following figure.<br />

Pilot train project A-1<br />

Route:<br />

<strong>Berlin</strong>-Grossbeeren – Nuremberg Bavaria port (– Adria port Ravenna/Venice) – Ulm<br />

(– Liguria ports Savona/Genoa/La Spezia)<br />

Working title: Gotthard/Brenner Route<br />

Reference in project TRANSITECTS:<br />

• Unaccompanied combined <strong>transport</strong> (work package 4)<br />

• Pilot train P-03 (Adriatic ports - Baden-Württemberg/Bavaria/<strong>Berlin</strong>)<br />

• Pilot train P-04 (Liguria ports – Baden-Wuerttemberg/Bavaria/<strong>Berlin</strong>)<br />

Fig.: Configuration <strong>of</strong> pilot train project A-1<br />

34