Henrik Forsgren - Geode
Henrik Forsgren - Geode
Henrik Forsgren - Geode
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CELSIUS City<br />
Summary CELSIUS<br />
27. ROT<br />
Datacenter 1<br />
and 2<br />
In operation<br />
End-user<br />
Sewage plant<br />
ROT 2014/2015<br />
Sust. Prod.<br />
Existing<br />
buildings and<br />
bus depot<br />
ROT 2016<br />
Dist./Infra struc.<br />
Meneba<br />
Industrial<br />
Connection<br />
ROT 2017<br />
End-user<br />
Waste<br />
Incineration<br />
ROT In op<br />
Sust. Prod.<br />
Heating hub<br />
ROT 2014/15<br />
Syst. Integr.<br />
/Storage/Dist./<br />
Infra struc.<br />
Cooling from<br />
river<br />
ROT In op<br />
Sust. Prod<br />
Vertical city<br />
ROT 2013/14<br />
Sust. Prod. Syst<br />
Integr.<br />
Aquifer storage<br />
for heating and<br />
cooling<br />
ROT In op Sust.<br />
Prod.<br />
28 and 29. ROT<br />
Datacenter 1<br />
and 2<br />
In operation<br />
End-user<br />
Small DH ICT<br />
LON 2012-2015<br />
Syst. Interg./<br />
Distr./ Infra<br />
struc.<br />
2.GOT<br />
Integration with<br />
other municipalities<br />
In operation<br />
System integration<br />
DH to ships<br />
GOT 2013<br />
End-user<br />
Total prod. and<br />
distr. Syst.<br />
GOT In op<br />
Dist./infra struc.<br />
Syst. Integ.<br />
Climate<br />
agreement<br />
GOT In op<br />
End-user<br />
Industrial waste<br />
heat<br />
GOT In op<br />
Sust. Prod.<br />
Short term<br />
Storgage<br />
GOT 2014<br />
Storage<br />
DH to<br />
whitegoods<br />
GOT 2013<br />
End-user<br />
Long term<br />
storage<br />
GOT 2016<br />
Storage<br />
Solar heat<br />
connected to<br />
DH system<br />
GOT In op<br />
Sust. Prod<br />
• A project within EU’s 7th Framework<br />
Programme, “Smart Cities” headed by DG<br />
ENERGY.<br />
• “IMPACT” focus<br />
• 50 new CELSIUS cities<br />
• Vision:100TWh reduction in primary<br />
energy<br />
• Gothenburg to coordinate the project,<br />
consisting of 21 internationally leading<br />
partners.<br />
• EU’s largest Smart City project: Budget: 21M€<br />
whereof 14M€ EU support<br />
Consumer<br />
Control<br />
GEN 2015<br />
Syst. Integr.<br />
Turbogenerator.<br />
gasgrid<br />
GEN 2015<br />
Sust. Prod.<br />
ThermoSolar<br />
plants for<br />
heating<br />
CGN<br />
Syst. Integr.<br />
Biogas heating<br />
residential area<br />
Stammheim<br />
CGN<br />
Sust. Prod.<br />
existing demonstrator, to be improved in CELSIUS city<br />
planned to be build in CELSIUS City with FP7 funding<br />
12x sewage<br />
water HP<br />
CGN 2013/14<br />
Sust. Prod.<br />
”KlimaKreisKöln”<br />
Funding local<br />
EE-initiatives<br />
CGN<br />
End User<br />
Cooling from<br />
river<br />
GOT In op<br />
Sust. Prod<br />
Absorption<br />
cooling<br />
GOT In op<br />
Sust. Prod<br />
Biofuel CHP<br />
GOT In op<br />
Sust. Prod.<br />
Waste<br />
Incineration<br />
GOT In op<br />
Sust. Prod.<br />
• Start in Q1 2013, planned ending Q4 2016.<br />
• Demonstrators:<br />
• +20 existing demonstrators<br />
• 13 new to be built<br />
• Contract negotiations ongoing.