22.01.2015 Views

Henrik Forsgren - Geode

Henrik Forsgren - Geode

Henrik Forsgren - Geode

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CELSIUS City<br />

Summary CELSIUS<br />

27. ROT<br />

Datacenter 1<br />

and 2<br />

In operation<br />

End-user<br />

Sewage plant<br />

ROT 2014/2015<br />

Sust. Prod.<br />

Existing<br />

buildings and<br />

bus depot<br />

ROT 2016<br />

Dist./Infra struc.<br />

Meneba<br />

Industrial<br />

Connection<br />

ROT 2017<br />

End-user<br />

Waste<br />

Incineration<br />

ROT In op<br />

Sust. Prod.<br />

Heating hub<br />

ROT 2014/15<br />

Syst. Integr.<br />

/Storage/Dist./<br />

Infra struc.<br />

Cooling from<br />

river<br />

ROT In op<br />

Sust. Prod<br />

Vertical city<br />

ROT 2013/14<br />

Sust. Prod. Syst<br />

Integr.<br />

Aquifer storage<br />

for heating and<br />

cooling<br />

ROT In op Sust.<br />

Prod.<br />

28 and 29. ROT<br />

Datacenter 1<br />

and 2<br />

In operation<br />

End-user<br />

Small DH ICT<br />

LON 2012-2015<br />

Syst. Interg./<br />

Distr./ Infra<br />

struc.<br />

2.GOT<br />

Integration with<br />

other municipalities<br />

In operation<br />

System integration<br />

DH to ships<br />

GOT 2013<br />

End-user<br />

Total prod. and<br />

distr. Syst.<br />

GOT In op<br />

Dist./infra struc.<br />

Syst. Integ.<br />

Climate<br />

agreement<br />

GOT In op<br />

End-user<br />

Industrial waste<br />

heat<br />

GOT In op<br />

Sust. Prod.<br />

Short term<br />

Storgage<br />

GOT 2014<br />

Storage<br />

DH to<br />

whitegoods<br />

GOT 2013<br />

End-user<br />

Long term<br />

storage<br />

GOT 2016<br />

Storage<br />

Solar heat<br />

connected to<br />

DH system<br />

GOT In op<br />

Sust. Prod<br />

• A project within EU’s 7th Framework<br />

Programme, “Smart Cities” headed by DG<br />

ENERGY.<br />

• “IMPACT” focus<br />

• 50 new CELSIUS cities<br />

• Vision:100TWh reduction in primary<br />

energy<br />

• Gothenburg to coordinate the project,<br />

consisting of 21 internationally leading<br />

partners.<br />

• EU’s largest Smart City project: Budget: 21M€<br />

whereof 14M€ EU support<br />

Consumer<br />

Control<br />

GEN 2015<br />

Syst. Integr.<br />

Turbogenerator.<br />

gasgrid<br />

GEN 2015<br />

Sust. Prod.<br />

ThermoSolar<br />

plants for<br />

heating<br />

CGN<br />

Syst. Integr.<br />

Biogas heating<br />

residential area<br />

Stammheim<br />

CGN<br />

Sust. Prod.<br />

existing demonstrator, to be improved in CELSIUS city<br />

planned to be build in CELSIUS City with FP7 funding<br />

12x sewage<br />

water HP<br />

CGN 2013/14<br />

Sust. Prod.<br />

”KlimaKreisKöln”<br />

Funding local<br />

EE-initiatives<br />

CGN<br />

End User<br />

Cooling from<br />

river<br />

GOT In op<br />

Sust. Prod<br />

Absorption<br />

cooling<br />

GOT In op<br />

Sust. Prod<br />

Biofuel CHP<br />

GOT In op<br />

Sust. Prod.<br />

Waste<br />

Incineration<br />

GOT In op<br />

Sust. Prod.<br />

• Start in Q1 2013, planned ending Q4 2016.<br />

• Demonstrators:<br />

• +20 existing demonstrators<br />

• 13 new to be built<br />

• Contract negotiations ongoing.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!