A Telecommunications Industry Forum TCIF EDI - ATIS
A Telecommunications Industry Forum TCIF EDI - ATIS
A Telecommunications Industry Forum TCIF EDI - ATIS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>TCIF</strong>/<strong>EDI</strong> GUIDELINE<br />
INDUSTRY CONVENTIONS<br />
<strong>EDI</strong> LSOG MECHANIZATION SPECIFICATION 4 ASC X12 VERSION 004020<br />
CODE DESCRIPTION<br />
71 (Working) Shift Number<br />
Identifies a working shift for a company<br />
with multiple working shifts per day<br />
72 Schedule Reference Number<br />
Identifies a number for a program<br />
schedule (for example, a logic type of<br />
network) or working schedule to<br />
complete a specific task or set of tasks<br />
73 Statement of Work (SOW)<br />
Description of a product or service to be<br />
procured under a contract; statement of<br />
requirements<br />
74 Work Breakdown Structure (WBS)<br />
A product-oriented family tree<br />
composed of hardware, software,<br />
services, and data that completely<br />
defines the project or program<br />
75 Organization Breakdown Structure<br />
A functionally oriented family tree that<br />
shows organization relationships and is<br />
used as the framework for assigning<br />
work responsibilities<br />
76 Milestone<br />
A specific event that can be identified<br />
as occurring at a specific time<br />
77 Work Package<br />
A detailed, short span task or material<br />
item identified by a contractor for doing<br />
the work required to complete the<br />
contract<br />
78 Planning Package<br />
A logical aggregation of work within a<br />
cost account (see code 79) that can be<br />
identified and budgeted, but not yet<br />
defined into work packages<br />
79 Cost Account<br />
A management control point for cost<br />
and schedule planning and control; it<br />
represents that work assigned to one<br />
responsible organization element and to<br />
one work breakdown structure element<br />
7A Purchase Order Number Included in<br />
On-Order Position<br />
7B Purchase Order Number of Shipment<br />
Received since Last Reporting Date<br />
7C Purchase Order Number of Order<br />
Received since Last Reporting Date<br />
7D Tester Identification<br />
7E Collector Identification<br />
7F Repeat Location<br />
7G Data Quality Reject Reason<br />
7H Environmental Protection Agency (EPA)<br />
Test Type Purpose Code<br />
7I Subscriber Authorization Number<br />
CODE<br />
7J<br />
7K<br />
7L<br />
7M<br />
7N<br />
7O<br />
7P<br />
7Q<br />
7R<br />
7S<br />
7T<br />
7U<br />
7W<br />
7X<br />
7Y<br />
7Z<br />
DESCRIPTION<br />
Toll Billing Telephone Reference<br />
Number<br />
List of Materials<br />
Qualified Materials List<br />
Frame<br />
Piggyback<br />
A single commercial unit that consists<br />
of two different pieces of advertising<br />
material<br />
Tripleback<br />
A single commercial unit that consists<br />
of three different pieces of advertising<br />
material<br />
Sheet<br />
Engineering Change Order<br />
Representative Identification Number<br />
Drawing Type<br />
Master Contract<br />
Related Transaction Reference Number<br />
Interchange Train Identification<br />
Home Mortgage Disclosure Act (HMDA)<br />
State Code<br />
Home Mortgage Disclosure Act (HMDA)<br />
County Code<br />
Home Mortgage Disclosure Act (HMDA)<br />
Metropolitan Statistical Area (MSA)<br />
80 Charge Number<br />
A number used by financial systems to<br />
identify accounts for costs incurred on a<br />
contract<br />
81 Symbol Number (for Milestone or LOB<br />
reports)<br />
Symbols are used for graphical<br />
representation on Milestone schedule<br />
reports and Line of Balance reports; the<br />
various symbols indicate planned,<br />
revised, completed, and slipped events;<br />
symbols used are mutually agreed upon<br />
between supplier and customer<br />
82 Data Item Description (DID) Reference<br />
Specific data elements that the<br />
government will ask a contractor to<br />
provide and are spelled out in specific<br />
requirement documents<br />
83 Extended (or Exhibit) Line Item Number<br />
(ELIN)<br />
Identifies specific line items to be<br />
delivered for a contract<br />
84 Contractor Data Requirements List<br />
(CDRL)<br />
Government or customer specific<br />
deliverables identified by line item;<br />
June 21, 1999 10.3-32