OPERATIONAL PLANNING WORKSHEET ICS 215-OS
OPERATIONAL PLANNING WORKSHEET ICS 215-OS
OPERATIONAL PLANNING WORKSHEET ICS 215-OS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Item #<br />
10.<br />
11.<br />
12.<br />
13.<br />
Item Title<br />
Total Resources<br />
Required<br />
Total Resources On<br />
Hand<br />
Total Resources<br />
Needed<br />
Prepared By<br />
Date/Time<br />
Instructions<br />
Enter the total number of resources required. Add all of the "Req."<br />
fields above.<br />
Enter the total number of resources on hand. Add all of the "Have"<br />
fields above.<br />
The Total Resources Needed is the difference between the Total<br />
Resources Required and the Total Resources On Hand.<br />
Enter name and title of the person preparing the form.<br />
Enter date (month, day, year) and time prepared (24-hour clock).