26.01.2015 Views

HEVEL Solar

HEVEL Solar

HEVEL Solar

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Free-field solar parks<br />

System capacity: 1 - 100 MW<br />

Required area: 2.5 ha / MW<br />

• Installation requirements:<br />

- Flat area.<br />

- South orientation installation<br />

- angle 20 – 25 degrees<br />

• Soil requirements :<br />

- Any ground is allowed, but the cost<br />

of under-structure may vary.<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!