30.01.2015 Views

Evaluation of Remedial Measures to Control Non-Point Sources of ...

Evaluation of Remedial Measures to Control Non-Point Sources of ...

Evaluation of Remedial Measures to Control Non-Point Sources of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Marshall Macklin Monaghan<br />

Limited<br />

Consulting<br />

Engineers<br />

Surveyors<br />

Planners<br />

Mr. G. Bangay 1977-10-19<br />

Land Use Studies Co-ordination File: 11-77026-101<br />

CCIW, EPS<br />

Department <strong>of</strong> the Environment<br />

P.O. Box 5050<br />

867 Lakeshore Road<br />

Burling<strong>to</strong>n, Ontario L7P 4A6<br />

275 Duncan Mill Road Offices: Don Mills<br />

Don Mills, Ont. M3B 2Y1 Cambridge, Elliot Lake,<br />

(416) 449-2500 Hamil<strong>to</strong>n, Mississauga,<br />

Telex 06-966 695<br />

Oakville, Waterloo, Whitby<br />

Re:<br />

<strong>Evaluation</strong> <strong>of</strong> all <strong>Remedial</strong> <strong>Measures</strong><br />

<strong>to</strong> <strong>Control</strong> <strong>Non</strong>-<strong>Point</strong> <strong>Sources</strong> <strong>of</strong> Water<br />

Pollution in the Great Lakes Basin<br />

D.S.S. File: 02SS KE109-6-6151<br />

Final Report<br />

Dear Sir:<br />

We take pleasure in submitting this final report in accordance with the terms <strong>of</strong> reference established for this study.<br />

This assignment has brought <strong>to</strong>gether in<strong>to</strong> one document a wide variety <strong>of</strong> alternative measures which can be<br />

implemented in an effort <strong>to</strong> reduce the contamination <strong>of</strong> surface water from non-point sources. Since new or<br />

modified remedial measures are continuing <strong>to</strong> be developed, the report has been bound in a 3-ring style binder in<br />

order that new pages can easily be added by copy holders.<br />

We trust you will find the comments made during our technical review meetings and upon the draft final report<br />

incorporated <strong>to</strong> your satisfaction, and the report in general conformance <strong>to</strong> your expectations.<br />

It has been a pleasure working with the PLUARG Sub-committee on this most interesting project.<br />

Yours very truly,<br />

MARSHALL MACKLIN MONAGHAN LIMITED<br />

A.L. Atkinson, P. Eng.<br />

Project Direc<strong>to</strong>r<br />

B.M. Cosburn, P. Eng.<br />

Project Engineer<br />

BMC/ALA/vd<br />

Encl.<br />

Partners: Consultant : D.R. Brothers<strong>to</strong>n, OLS, P Eng L.R. McCartney, P Eng Associates: D.B. Searles, OLS<br />

H.L. Macklin, OLS, P Eng O.J. Marshall, OLS, P Eng W. Collinson, P Eng. W.M. Pinker<strong>to</strong>n, P Eng. G. Bellach. OLS R.G. Shugg, OLS, P Eng<br />

P.A. Monaghan, OLS, P Eng <strong>Control</strong>ler : L.T. Eklund, P Eng. M.M. Rose, MRAIC, MCIP F.B. Delph, OLS G.F. Smerdon, OLS, P Eng.<br />

J.W.L Monaghan, OLS, P Eng R.E Wright, CA E.D. Gerritsen, P Eng. A. Tarvydas, OLS B.J. Feherty, P Eng J. Vinklers, OLS, P Eng<br />

K.A. McLennan, P Eng C.C. Henderson, P Eng. H.A. Van Dusen, P Eng. C.A. MacDonald, OLS M. Vorsteveld, OLS<br />

L.R. Kentridqe, MRAIC, MCIP Associate Partners: CS. Holtrop, P Eng J.H. Van Poorten, P Eng. A. Marin, P Eng. J.M. Yaremovich, P Eng<br />

H .N. Edarritila, P Eng. A.L. Atkinson, P Eng. G.H. Horning, P Eng. N.E. Walker, P Eng. J.M. Mark, P Eng.<br />

J.L. Tersigni, P Eng D.W. Beasley, MCIP D.J. Howe, OLS G.L. Wilks, OLS. P Eng. P.L. Marrs, P Eng<br />

J.A. Metcalfe, P Eng J.B. Bodden, P Eng. C.W. Longden, CSI S.G. Zabek, OLS J.H. Rust, MRAIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!