Evaluation of Remedial Measures to Control Non-Point Sources of ...
Evaluation of Remedial Measures to Control Non-Point Sources of ...
Evaluation of Remedial Measures to Control Non-Point Sources of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Marshall Macklin Monaghan<br />
Limited<br />
Consulting<br />
Engineers<br />
Surveyors<br />
Planners<br />
Mr. G. Bangay 1977-10-19<br />
Land Use Studies Co-ordination File: 11-77026-101<br />
CCIW, EPS<br />
Department <strong>of</strong> the Environment<br />
P.O. Box 5050<br />
867 Lakeshore Road<br />
Burling<strong>to</strong>n, Ontario L7P 4A6<br />
275 Duncan Mill Road Offices: Don Mills<br />
Don Mills, Ont. M3B 2Y1 Cambridge, Elliot Lake,<br />
(416) 449-2500 Hamil<strong>to</strong>n, Mississauga,<br />
Telex 06-966 695<br />
Oakville, Waterloo, Whitby<br />
Re:<br />
<strong>Evaluation</strong> <strong>of</strong> all <strong>Remedial</strong> <strong>Measures</strong><br />
<strong>to</strong> <strong>Control</strong> <strong>Non</strong>-<strong>Point</strong> <strong>Sources</strong> <strong>of</strong> Water<br />
Pollution in the Great Lakes Basin<br />
D.S.S. File: 02SS KE109-6-6151<br />
Final Report<br />
Dear Sir:<br />
We take pleasure in submitting this final report in accordance with the terms <strong>of</strong> reference established for this study.<br />
This assignment has brought <strong>to</strong>gether in<strong>to</strong> one document a wide variety <strong>of</strong> alternative measures which can be<br />
implemented in an effort <strong>to</strong> reduce the contamination <strong>of</strong> surface water from non-point sources. Since new or<br />
modified remedial measures are continuing <strong>to</strong> be developed, the report has been bound in a 3-ring style binder in<br />
order that new pages can easily be added by copy holders.<br />
We trust you will find the comments made during our technical review meetings and upon the draft final report<br />
incorporated <strong>to</strong> your satisfaction, and the report in general conformance <strong>to</strong> your expectations.<br />
It has been a pleasure working with the PLUARG Sub-committee on this most interesting project.<br />
Yours very truly,<br />
MARSHALL MACKLIN MONAGHAN LIMITED<br />
A.L. Atkinson, P. Eng.<br />
Project Direc<strong>to</strong>r<br />
B.M. Cosburn, P. Eng.<br />
Project Engineer<br />
BMC/ALA/vd<br />
Encl.<br />
Partners: Consultant : D.R. Brothers<strong>to</strong>n, OLS, P Eng L.R. McCartney, P Eng Associates: D.B. Searles, OLS<br />
H.L. Macklin, OLS, P Eng O.J. Marshall, OLS, P Eng W. Collinson, P Eng. W.M. Pinker<strong>to</strong>n, P Eng. G. Bellach. OLS R.G. Shugg, OLS, P Eng<br />
P.A. Monaghan, OLS, P Eng <strong>Control</strong>ler : L.T. Eklund, P Eng. M.M. Rose, MRAIC, MCIP F.B. Delph, OLS G.F. Smerdon, OLS, P Eng.<br />
J.W.L Monaghan, OLS, P Eng R.E Wright, CA E.D. Gerritsen, P Eng. A. Tarvydas, OLS B.J. Feherty, P Eng J. Vinklers, OLS, P Eng<br />
K.A. McLennan, P Eng C.C. Henderson, P Eng. H.A. Van Dusen, P Eng. C.A. MacDonald, OLS M. Vorsteveld, OLS<br />
L.R. Kentridqe, MRAIC, MCIP Associate Partners: CS. Holtrop, P Eng J.H. Van Poorten, P Eng. A. Marin, P Eng. J.M. Yaremovich, P Eng<br />
H .N. Edarritila, P Eng. A.L. Atkinson, P Eng. G.H. Horning, P Eng. N.E. Walker, P Eng. J.M. Mark, P Eng.<br />
J.L. Tersigni, P Eng D.W. Beasley, MCIP D.J. Howe, OLS G.L. Wilks, OLS. P Eng. P.L. Marrs, P Eng<br />
J.A. Metcalfe, P Eng J.B. Bodden, P Eng. C.W. Longden, CSI S.G. Zabek, OLS J.H. Rust, MRAIC