“State Road Improvement Project”<br />

Rehabilitation Project Package II – <strong>Central</strong> <strong>Region</strong><br />

Background<br />

<strong>Kerala</strong> Government has embarked upon a massive State Road Network<br />

Development Programme, ie: the State Road Improvement Project, aimed<br />

at the development of an excellent state - of - the art road network by<br />

improving the existing State Highways and important major District<br />

Roads. The objective of the Improvement project is to enhance the<br />

capacity and riding quality, ensuring high quality construction, proper<br />

maintenance plan, road safety and reducing state and reducing State’s<br />

expenditure for periodic maintenance. <strong>Kerala</strong> Road Fund Board (KRFB),<br />

Govt. of <strong>Kerala</strong>, has selected Wilbur Smith Associates to prepare a<br />

technical report on short listing the roads for improvement and structuring<br />

them into various packages for implementation.<br />

A stretch of 1204 km of road have been identified and categorised into<br />

two groups ie: 1) Rehabilitation scheme and (2) for up gradation scheme.<br />

The term “Rehabilitation includes strengthening/ rehabilitation/<br />

improvements to pavement, structures/ road furniture/ traffic management<br />

measures, etc. Up gradation involves widening of the carriageway with<br />

paved shoulders restricting mostly within the available right – of – way or<br />

with minimum land acquisition at selected locations as part of the<br />

capacity augmentation. However the up gradation of roads which<br />

involves major land acquisitions were categorised separately.<br />

Suitable contract packages were finalised and recommended for<br />

implementation. Contract packages were finalised separately for<br />

“rehabilitation” and “up gradation”. The roads selected under<br />

rehabilitation category consist of total of 551 kms spread across 28<br />

sections.<br />

Deficiency analysis & Proposed Improvement under Rehabilitation<br />

Based on the field surveys such as traffic volume count and OD surveys,<br />

road inventory & Condition Surveys, BBD Surveys etc, the details on the<br />

existing features along with deficiencies were identified and the proposals<br />

for the improvements were made accordingly. Under Rehabilitation<br />

scheme, the existing road geometry is retained as it is in order to avoid<br />

land acquisition and only pavement strengthening is carried out with<br />

suitable traffic management devices such as road markings, signage,<br />

studs, and crash barriers.<br />

The proposed improvements for the roads under rehabilitation packages<br />

include<br />