<strong>matka</strong> Filter<br />

TABLE 2<br />

Raw Material cost of Raw Material cost of Raw Material<br />

(for 100 units of Matka Filter in Rs.)<br />

(for 1 unit in Rs.)<br />

Clay 450 (for 1 trailer load, approx. 80 Cu. Ft.) 4.50<br />

Sand 160 (for 16 Cu. Ft.) 1.60<br />

Saw Dust 178 (for 16 Cu. Ft.) 1.78<br />

Cow Dung Cakes 2,400 24.00<br />

Wood Charcoal 990 9.90<br />

Paddy Straw 750 7.50<br />

Tap 3,000 30.00<br />

Cement 6 0.06<br />

Total rs. 7,934 rs. 79.34<br />

Labour costs involved are:<br />

TABLE 3<br />

Type of nature of Work Time Required for Cost of Producing Cost of<br />

Worker Producing 100 100 Units (in Rs.) Producing<br />

units (in days)<br />

1 Unit (in Rs.)<br />

Artisan Construction of <strong>matka</strong> <strong>filter</strong> 36 36X300= 10,800 108.00<br />

Labourer Construction of <strong>matka</strong> <strong>filter</strong> 36 36X150= 5,400 54.00<br />

Artisan Baking the pots 4 4X300= 1, 200 12.00<br />

Labourer Baking the pots 4 4X150= 600 6.00<br />

Painter Painting the pots 4,000 40.00<br />

Total 40 Rs. 22,000 Rs. 220.00<br />

Total expenditure for production of 100 units of <strong>matka</strong> <strong>filter</strong>:<br />

TABLE 4<br />

Cost Component expenditure for Production expenditure for<br />

of 100 Units (in Rs.) Production of 1 Unit (in Rs.)<br />

Raw Material 7,934 79.34<br />

Labour 22,000 220.00<br />

Total rs. 29,934 rs. 299.34<br />

9