<strong>matka</strong> Filter<br />
TABLE 2<br />
Raw Material cost of Raw Material cost of Raw Material<br />
(for 100 units of Matka Filter in Rs.)<br />
(for 1 unit in Rs.)<br />
Clay 450 (for 1 trailer load, approx. 80 Cu. Ft.) 4.50<br />
Sand 160 (for 16 Cu. Ft.) 1.60<br />
Saw Dust 178 (for 16 Cu. Ft.) 1.78<br />
Cow Dung Cakes 2,400 24.00<br />
Wood Charcoal 990 9.90<br />
Paddy Straw 750 7.50<br />
Tap 3,000 30.00<br />
Cement 6 0.06<br />
Total rs. 7,934 rs. 79.34<br />
Labour costs involved are:<br />
TABLE 3<br />
Type of nature of Work Time Required for Cost of Producing Cost of<br />
Worker Producing 100 100 Units (in Rs.) Producing<br />
units (in days)<br />
1 Unit (in Rs.)<br />
Artisan Construction of <strong>matka</strong> <strong>filter</strong> 36 36X300= 10,800 108.00<br />
Labourer Construction of <strong>matka</strong> <strong>filter</strong> 36 36X150= 5,400 54.00<br />
Artisan Baking the pots 4 4X300= 1, 200 12.00<br />
Labourer Baking the pots 4 4X150= 600 6.00<br />
Painter Painting the pots 4,000 40.00<br />
Total 40 Rs. 22,000 Rs. 220.00<br />
Total expenditure for production of 100 units of <strong>matka</strong> <strong>filter</strong>:<br />
TABLE 4<br />
Cost Component expenditure for Production expenditure for<br />
of 100 Units (in Rs.) Production of 1 Unit (in Rs.)<br />
Raw Material 7,934 79.34<br />
Labour 22,000 220.00<br />
Total rs. 29,934 rs. 299.34<br />