“Computational Civil Engineering 2007”, International Symposium 91<br />

Figure 13. Riveting of the new steel elements<br />

New reinforcement of the corner post – cross girder was disposed (Figure 12).<br />

One of the most difficult problems was the riveting of the new elements (Figure<br />

13). In order to maintain the initial character of the structure rivets with diameter of<br />

21 and 23 mm were chosen.<br />

In figure 14 the reinforcement of a current upper chord joint is presented.<br />

Figure 14. Reinforcement of upper chord joint<br />

Gusset t=13 mm<br />

In figure 15 the tie member of the lower chord and the tie member of cross girder<br />

can be seen.<br />

In figure 16 the local consolidation in a current joint of the upper chord is shown.