Pre qualification drawings - Tender - University of Pretoria
Pre qualification drawings - Tender - University of Pretoria
Pre qualification drawings - Tender - University of Pretoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6<br />
54321<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
I<br />
J<br />
56300<br />
7630 13080 2530 2480 4860 2480 13080 7630<br />
2480 6360 5940 5940 6360 5000 5000 5000<br />
4096<br />
5704<br />
230 2500 230 815 230 1700 230 1606 400 1610 250<br />
7200<br />
CONCR. STAIRS<br />
LANDING BY ENG.<br />
COVERED WALKWAY<br />
ABOVE<br />
1 ABOVE<br />
ELECTRONIC EVACUATION PANEL<br />
1<br />
2000<br />
CONCR. BEAM BY ENG. ABOVE<br />
SF1.3<br />
CONCR. ROOF ABOVE<br />
2 2<br />
3<br />
1370<br />
2830<br />
7500<br />
RWDP<br />
SF1.19<br />
RWDP<br />
RWDP<br />
SF 1.6<br />
SEE RWDP<br />
4 4<br />
9030<br />
B DATA<br />
CIRCULATION<br />
DB B<br />
1 2<br />
5 3 4 5 6 7 8 9 10 11 12 13 14 1516 17 18 19 20 21<br />
TOTEM POLE<br />
PASSAGE STEPS<br />
5<br />
42850<br />
21360<br />
9030<br />
B<br />
D1-18<br />
B<br />
RWDP<br />
6 SF1.14<br />
SF1-11<br />
6<br />
21490<br />
4800<br />
2x DCP SF1.15<br />
W1.1<br />
2x DCP<br />
CAVITY<br />
B<br />
B<br />
7 FHR & 2x<br />
7<br />
7660<br />
1370<br />
D<br />
301<br />
B<br />
300<br />
C<br />
301<br />
IN-SITU<br />
CONCR.<br />
SEAT<br />
LANDING<br />
IN-SITU CONCR. RAMP<br />
LANDSCAPING<br />
1 2 3<br />
1500<br />
4<br />
LANDSCAPING<br />
IN-SITU CONCR.<br />
WALL BELOW<br />
IN-SITU CONCR. SEAT<br />
IN-SITU CONCR. SEAT<br />
IN-SITU CONCR. SEAT<br />
GALV. STEEL A/C DUCTING BEHIND<br />
ALU. SCREEN ON STEEL STRUCTURE<br />
IN-SITU CONCR. SEAT<br />
IN-SITU CONCR. SEAT<br />
GALV. STEEL<br />
STRUCTURE FOR<br />
CREEPERS OVERHEAD<br />
IN-SITU CONCR. RAMP<br />
LANDSCAPING<br />
SCP<br />
E<br />
302<br />
A<br />
300<br />
PASSAGE STEPS<br />
PASSAGE STEPS<br />
F<br />
302<br />
PASSAGE STEPS<br />
PASSAGE STEPS<br />
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3<br />
PASSAGE STEPS<br />
PASSAGE<br />
PASSAGE<br />
PASSAGE RAMP<br />
PASSAGE RAMP<br />
PASSAGE RAMP<br />
6<br />
5<br />
4<br />
3<br />
PASSAGE RAMP<br />
2<br />
1<br />
G<br />
303<br />
COVERED<br />
ENTRANCE<br />
TILES<br />
IN-SITU CONCR. SEAT<br />
IN-SITU CONCR. SEAT<br />
H<br />
303<br />
4540 2960<br />
230<br />
2500<br />
230<br />
SHELVES<br />
SERVICES<br />
BUILDING<br />
EXPANSION JOINT<br />
FHR &<br />
2x DPC<br />
MALE<br />
TILES<br />
TOC X 1370.900<br />
RWDP<br />
LANDING BY ENG. LANDSCAPING<br />
LANDING BY ENG.<br />
8 ABOVE<br />
ABOVE<br />
8<br />
TOC X 1370.650<br />
SCP<br />
ACOUSTIC PANELLING<br />
RWDP<br />
SCP<br />
SCP<br />
550<br />
RWDP<br />
20<br />
21 3<br />
R<br />
308<br />
19 18<br />
17<br />
16<br />
ACOUSTIC<br />
PANELLING<br />
15 14 13 12 11 10 9 8<br />
230<br />
1800<br />
300<br />
1800<br />
230<br />
1800<br />
F<br />
302<br />
300<br />
2 1<br />
1 2 3<br />
1 2<br />
3<br />
RAMP<br />
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3<br />
21 3<br />
350<br />
20<br />
550<br />
19<br />
550<br />
350<br />
RWDP<br />
350<br />
18<br />
17<br />
550<br />
350<br />
16<br />
15<br />
550<br />
350<br />
SF1.17<br />
14<br />
13<br />
12<br />
RAMP<br />
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3<br />
ACOUSTIC<br />
PANELLING<br />
SF1.16<br />
11<br />
10<br />
9<br />
SCP<br />
8<br />
7<br />
7<br />
6<br />
SCP<br />
6<br />
5<br />
5<br />
4<br />
4<br />
2<br />
2<br />
1<br />
1100<br />
IN-SITU CONCR. SEAT<br />
1<br />
D1-8<br />
1100<br />
1100<br />
2<br />
D1-7<br />
RWDP<br />
SCP<br />
1<br />
2 1<br />
SCP<br />
FIRE<br />
EXIT<br />
LOBBY<br />
FIRE<br />
EXIT D1-7.1<br />
LOBBY<br />
RWDP<br />
LANDSCAPING<br />
SEATING<br />
SCULPTURE<br />
WITH LIGHT<br />
FEATURE<br />
1800<br />
1800<br />
COVERED WALKWAY<br />
ROOF LINE ABOVE<br />
750<br />
230<br />
90.00°<br />
VOID<br />
D1-8.1<br />
1x WHEEL<br />
CHAIRS<br />
1x WHEEL<br />
CHAIRS<br />
90.00°<br />
CONCR. STAIRS<br />
FHR &<br />
2x DCP<br />
LECTURE<br />
ROOM<br />
0-1<br />
VOID<br />
4000<br />
3020<br />
FHR &<br />
RWDP<br />
FIRE STAIR 1<br />
REFER TO SHEET<br />
350 FOR DETAIL<br />
TILES<br />
SF1.18<br />
RWDP<br />
PASSAGE RAMP<br />
REFER TO SHEET 906<br />
FOR BENCH DETAILS<br />
750 230 3020<br />
4000<br />
FIRE STAIR 3<br />
REFER TO SHEET<br />
354 FOR DETAIL<br />
TILES<br />
RWDP<br />
SCP<br />
1x WHEEL<br />
CHAIRS<br />
RWDP<br />
SCP<br />
CONCR. ROOF<br />
LINE ABOVE<br />
TOC X 1370.730<br />
SCP<br />
1x WHEEL<br />
CHAIRS<br />
SHELVES<br />
170 STEP<br />
DOWN<br />
POWDER COATED ALU. Y-PROFILE<br />
LOUVRES FIXED TO STEEL<br />
STRUCTURE<br />
SCP<br />
LANDSCAPING<br />
CONCR. ROOF ABOVE<br />
SCP<br />
SHELVES<br />
REFER TO SHEET 901<br />
FOR INTERIOR<br />
ELEVATIONS & DETAILS<br />
OF LECTURE HALLS<br />
7660<br />
230<br />
1735<br />
115<br />
5350<br />
230<br />
CONCR. UPSTAND<br />
1735<br />
850<br />
115<br />
850<br />
850<br />
1750<br />
850<br />
50<br />
50<br />
50<br />
50<br />
CE<br />
2520<br />
FLOOR<br />
1000 1610<br />
SPRINGS<br />
SANDBLASTED IN-SITU<br />
D1-1<br />
CONCR. BY ENG.<br />
ENTRANCE<br />
ENTRANCE<br />
ENTRANCE<br />
DOORS<br />
FOYER<br />
DOORS<br />
TOC X 1370.850 TOC X 1370.850<br />
RECESSED<br />
TILES<br />
RECESSED<br />
MAT WELL<br />
TOC X 1370.900<br />
MAT WELL<br />
D1-9<br />
FLOOR<br />
SPRINGS<br />
SF1.20 VENDING<br />
VENDING<br />
SF 1.5<br />
MACHING<br />
SF1.21<br />
MACHING<br />
GEORGIAN<br />
WIRE GLASS FHR &<br />
2x DCP<br />
HOLD OPEN<br />
DEVICE & DOOR<br />
B CLOSER<br />
D1-12.1<br />
B<br />
FIRE<br />
EXIT<br />
FLOOR<br />
SPRINGS<br />
1260 300<br />
FALL<br />
RWDP<br />
IE<br />
SCP<br />
2360 600<br />
LECTERN<br />
I<br />
304<br />
TOC X 1370.840<br />
ELECTRONIC<br />
SCREEN<br />
VERTICALLY MOVEABLE<br />
BLACK BOARD<br />
ELECTRONIC<br />
SCREEN<br />
D1-19.2<br />
DISABLED<br />
WC<br />
HWB<br />
1790 115<br />
WC<br />
J<br />
304<br />
SOUND<br />
LOBBY<br />
D1-12<br />
FLOOR<br />
SPRINGS<br />
SOUND<br />
LOBBY<br />
B D1-16.1<br />
ACOUSTIC<br />
PANELLING<br />
FHR &<br />
GEORGIAN 2x DCP<br />
WIRE GLASS<br />
SF1.13<br />
D1-6<br />
W1.4<br />
1500<br />
WC<br />
WC<br />
WC<br />
WC<br />
WC<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
RWDP<br />
B.O.E. CILL<br />
ACOUSTIC PANELLING<br />
ACOUSTIC PANELLING<br />
230<br />
2100<br />
230<br />
5292<br />
1785<br />
230<br />
3305<br />
DUCT<br />
ACOUSTIC PANELLING<br />
FOYER<br />
LINOLEUM<br />
TOC X 1370.900<br />
FFL X 1370.930<br />
REFER TO SHEET 910<br />
FOR INTERIOR<br />
ELEVATIONS & DETAILS<br />
OF LOBBIES & FOYERS<br />
SOUND DOORS<br />
ACOUSTIC PANELLING<br />
FHR &<br />
2x DCP<br />
FHR &<br />
2x DCP<br />
FEMALE<br />
TILES<br />
TOC X 1370.900<br />
BUILDING<br />
EXPANSION JOINT<br />
10<br />
FOYER<br />
16 9<br />
TILES<br />
17 8<br />
18 7<br />
TOC X 1370.900<br />
6<br />
FFL X 1370.930<br />
5<br />
STAIR 2 4<br />
REFER TO SHEET 3<br />
RECESSED<br />
2<br />
359 FOR DETAIL<br />
MAT WELL<br />
1<br />
1300 1000 1300 250<br />
2070 230<br />
2230 1840<br />
2230<br />
ELECTRONIC<br />
SCREEN<br />
VERTICALLY MOVEABLE<br />
BLACK BOARD<br />
ELECTRONIC<br />
SCREEN<br />
B B DPC, 80Ø B B<br />
D1-19.1<br />
850 HYDRANT<br />
D1-21.1<br />
D1-21.2<br />
D1-19<br />
DISABLED<br />
ALU.<br />
D1-20<br />
D1-21<br />
WC<br />
170 STEP<br />
DIVIDING<br />
HWB<br />
DOWN<br />
STRIP<br />
1500<br />
115 1790<br />
H/D H/D<br />
WC<br />
H/D H/D<br />
WC<br />
HWB<br />
IN-SITU CONCR. SEAT<br />
LIFT<br />
TILES<br />
RWDP<br />
HWB<br />
REFER TO SHEET 920 FOR<br />
ABLUTION BLOCK DETAILS<br />
8x UR<br />
1840 230<br />
7473<br />
18060<br />
230<br />
3305<br />
230<br />
1785<br />
230<br />
5295<br />
2100<br />
RWDP<br />
230<br />
K<br />
305<br />
SCULPTURES ON PODIUM<br />
TOC X 1371.300<br />
1200 4150 1850<br />
B<br />
D1-14<br />
B<br />
D1-16<br />
115 1070<br />
B<br />
B<br />
FAN<br />
DUCT<br />
SCP<br />
SOUND<br />
DOORS<br />
WC<br />
WC<br />
WC<br />
WC<br />
WC<br />
1345<br />
L<br />
305<br />
D1-10 D1-11<br />
SF1.22<br />
LINE OF CONCR. SLAB ABOVE<br />
FALL<br />
SF1.1<br />
SF1.2<br />
TOC X 1370.765<br />
IN-SITU<br />
CONCR. SEAT<br />
STAIR 1<br />
REFER TO SHEET<br />
358 FOR DETAIL<br />
RWDP 15<br />
14<br />
13<br />
12<br />
11<br />
FIRE 10<br />
9<br />
PANEL<br />
8<br />
7<br />
RWDP 6<br />
RWDP<br />
1 2 3 4 5<br />
B<br />
15<br />
14<br />
13<br />
12<br />
11<br />
W1.3 W1.2<br />
CONCR. ROOF LINE ABOVE<br />
LANDSCAPING<br />
IE<br />
M<br />
306<br />
FIRE DOOR<br />
D1-13.1<br />
SOUND<br />
LOBBY<br />
D1-13<br />
SOUND<br />
DOOR<br />
B<br />
D1-15<br />
B<br />
D1-17<br />
SOUND<br />
LOBBY<br />
D1-17.1<br />
HWB<br />
1m HIGH S/STEEL H/RAIL<br />
B<br />
SF1-12<br />
1000 2500 1300<br />
N<br />
306<br />
GEORGIAN<br />
WIRE GLASS<br />
B<br />
B<br />
SF1.4<br />
2960<br />
TOC X 1372.600<br />
GEORGIAN<br />
WIRE GLASS<br />
B.O.E. CILL<br />
D1-5<br />
WC<br />
WC<br />
WC<br />
WC<br />
WC<br />
LECTERN<br />
SHELVES<br />
SERVICES<br />
O<br />
307<br />
SCP SCP SCP<br />
TOC X 1371.300<br />
230 1620<br />
HWB<br />
1200 4150 1850<br />
NEW SEWER CONNECTION<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
TOC X 1371.780<br />
POWDERCOATED ALU. SHOP<br />
FRONT AS PER SCHEDULE<br />
TOC X 1371.070<br />
300 1260<br />
BRICKWORK UNDER<br />
STAIR SOFFIT<br />
SHELVES<br />
FIRE<br />
ESCAPE<br />
FALL<br />
RWDP<br />
IE<br />
SCP<br />
COVERED<br />
ENTRANCE<br />
TILES<br />
IN-SITU CONCR. SEAT<br />
1x WHEEL<br />
CHAIRS<br />
SHELVES<br />
IN-SITU CONCR. SEAT<br />
FLOOR<br />
SPRINGS<br />
170 STEP<br />
DOWN<br />
CONCR. ROOF<br />
LINE ABOVE<br />
TOC X 1370.730<br />
TOTEM<br />
POLE<br />
P<br />
307<br />
RWDP<br />
FIRE STAIR 2<br />
REFER TO SHEET<br />
352 FOR DETAIL<br />
RWDP<br />
TILES<br />
SF1.7<br />
SCP<br />
PASSAGE RAMP<br />
PASSAGE RAMP<br />
RWDP<br />
CONCR. UPSTAND<br />
SCP<br />
SF1.10<br />
FIRE STAIR 4<br />
REFER TO SHEET<br />
356 FOR DETAIL<br />
TILES<br />
RWDP<br />
LANDSCAPING<br />
1 2 3 4 5 6<br />
TOC X 1371.350<br />
FHR &<br />
2x DCP<br />
PASSAGE RAMP<br />
LECTURE<br />
ROOM<br />
0-2<br />
PASSAGE RAMP<br />
PASSAGE RAMP<br />
FHR &<br />
1 2 3 4 5 6<br />
CONCR. STAIRS<br />
ALU. LOUVRES<br />
VITREX DOOR AND PANELS AS PER<br />
MANUFACTURER'S SPEC.<br />
FAIRFACE IN-SITU CONCR.<br />
COLUMN BY ENG.<br />
SCP<br />
IN-SITU CONCR. SEAT<br />
LANDSCAPING<br />
4000<br />
3020 230 750<br />
90.00°<br />
VOID<br />
D1-2.1<br />
REFER TO SHEET 906<br />
FOR BENCH DETAILS<br />
FIRE<br />
EXIT<br />
LOBBY<br />
PASSAGE<br />
FIRE<br />
D1-4.1 EXIT<br />
LOBBY<br />
VOID<br />
90.00°<br />
3020 230 750<br />
4000<br />
RWDP<br />
SCP<br />
1x WHEEL<br />
CHAIRS<br />
1x WHEEL<br />
CHAIRS<br />
RWDP<br />
D1-2<br />
PASSAGE<br />
RAMP<br />
RAMP<br />
3<br />
3 2 1<br />
1 2<br />
2 1<br />
Q<br />
308<br />
CONCR. STAIRS<br />
LANDING BY ENG.<br />
300 1800 230 1800<br />
TOC X 1371.334<br />
PASSAGE STEPS<br />
PASSAGE STEPS<br />
300 1800 230 1800<br />
TOC X 1370.625<br />
ACOUSTIC<br />
PANELLING<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21<br />
1100<br />
1 2<br />
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20<br />
PASSAGE STEPS<br />
PASSAGE STEPS<br />
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21<br />
SCP<br />
D1-4<br />
DUSTBIN &<br />
WATERPOINT<br />
SCP<br />
SCP<br />
SF1.8<br />
ACOUSTIC<br />
PANELLING<br />
TOC X 1370.850 TOC X 1370.650<br />
SCP<br />
SF1.9<br />
TOTEM POLE<br />
550<br />
350<br />
550<br />
350<br />
350<br />
550<br />
RWDP<br />
PASSAGE<br />
550<br />
350<br />
PASSAGE<br />
21<br />
550<br />
350<br />
21<br />
TOC X 1370.650<br />
SCP<br />
ACOUSTIC PANELLING<br />
SEE RWDP<br />
DETAIL<br />
1630<br />
TOTEM POLE<br />
GALV. STEEL STRUCTURE<br />
FOR CREEPERS OVERHEAD<br />
150Ø uPVC RWDP BUILT INTO WALL<br />
CAVITY<br />
NEW<br />
STORMWATER<br />
CATCHPIT(SCP)<br />
DUSTBIN &<br />
WATER POINT<br />
DETAIL<br />
SCP<br />
4187<br />
5674<br />
GALV. STEEL A/C DUCTING BEHIND<br />
ALU. SCREEN ON STEEL STRUCTURE<br />
TOC X 1370.650<br />
IN-SITU CONCR. RAMP<br />
IN-SITU CONCR. RAMP<br />
1488<br />
IN-SITU CONCR.<br />
WALL BELOW<br />
LANDSCAPING<br />
7400<br />
D<br />
301<br />
150Ø uPVC RWDP BUILT INTO WALL<br />
2000<br />
10330<br />
9030<br />
9030<br />
4800<br />
7660<br />
LANDING<br />
21360<br />
21490<br />
42850<br />
TOC X 1370.230<br />
STUDENT<br />
MEDICAL<br />
CENTRE<br />
1371<br />
PROPOSED POSITION<br />
TO PLANT EXISTING<br />
SMALL TREE<br />
3<br />
CAD FILE NAME:<br />
<br />
<br />
<br />
<br />
ARCHITECTURE<br />
<br />
REVISION SCHEDULE<br />
REV DATE DRAWN DESCRIPTION<br />
A 2010-02-22 CM First concept layout.<br />
B 2010-03-04 CM Second concept layout.<br />
C 2010-03-18 CM Entrance foyer/circulation revised.<br />
D 2010-04-22 CM Floor heights revised to contour levels &<br />
floor areas adjusted.<br />
E 2010-04-28 CM Submission <strong>of</strong> SDP to council.<br />
F 2010-05-11 CM Fire stairs adjusted to 1,8m width. Fire wall<br />
for all fire stairs. Fire hydrant position<br />
revised. Stair added & toilet design revised.<br />
G 2010-05-19 CM Toilet block enlarged. Section lines revised.<br />
Refinement <strong>of</strong> alu. louvred screen. Issue to<br />
consultants.<br />
H 2010-06-01 CM Toilet block enlarged. Section lines revised.<br />
Building plan submission.<br />
I 2010-06-09 BDV Refinement <strong>of</strong> concr. columns & beams.<br />
Data & DB rooms adjusted. Issue to<br />
consultants<br />
J 2010-06-22 BDV Add chemical store. Issue to consultants.<br />
K 2010-07-02 BDV Revised disabled toilet layout. Add general<br />
notes. Add plaster strip mesh legend &<br />
indicate on plan. Concr. wall now 250mm.<br />
Issue to QS for bill <strong>of</strong> quantities.<br />
L 2010-07-14 BDV Refinement <strong>of</strong> passage steps & raked<br />
seating in lecture halls. Indicate window &<br />
door numbers. Add electronic evacuation<br />
panel. Refinement <strong>of</strong> fire escape lobby. Add<br />
brickwork under stair 1 s<strong>of</strong>fit. Indicate new<br />
stormwater catchpits. Refinement <strong>of</strong> ablution<br />
block. Issue to consultants.<br />
M 2010-07-20 BDV Indicate services on plan. Concr. lift shaft<br />
now 230 facebrick with concr. columns by<br />
eng. Edit concr. ro<strong>of</strong> above & omit ro<strong>of</strong><br />
canopies. Parts <strong>of</strong> 250mm in-situ<br />
sandblasted concr. wall in lecture halls now<br />
230mm brickwork. Issue to consultants.<br />
N 2010-07-21 BDV Refinement <strong>of</strong> fullbores. Issue to QS<br />
O 2010-08-03 BDV MOVE GRIDLINES C, D, G & H. Brick walls<br />
in lecture halls now cavity walls. 250mm<br />
Concr. wall in lecture halls now brickwork<br />
with conr. columns by eng. Add RWDP &<br />
cavity wall detail plans. Edit levels for<br />
podium at stair 1. Omit D1-21. Edit door<br />
numbers in ablutions block. Refinement <strong>of</strong><br />
niche for fire hydrant in ablution block. Issue<br />
to consultants.<br />
P 2010-08-06 BDV Floor finish in lift now tiles. Add brickwork<br />
under fire stair 1, 2, 3 & 4. Add concr.<br />
upstands in ablution block ducts.<br />
Refinement <strong>of</strong> stair 2 widths. Issue to QS for<br />
bill <strong>of</strong> quantities.<br />
COPYRIGHT RESTS IN THE<br />
UNIVERSITY OF PRETORIA<br />
<br />
<br />
<br />
<br />
<br />
GENERAL NOTES:<br />
OLD<br />
AGRICULTURAL<br />
BUILDING<br />
GROUND FLOOR PLAN - LEVEL 1<br />
SCALE 1:100<br />
ALL LEVELS, DIMENSIONS AND POSITIONS TO BE CHECKED AND VERIFIED BEFORE ANY WORK IS COMMENCED.<br />
ANY ERRORS, DISCREPANCIES OR OMISSIONS TO BE REPORTED TO ARCHITECT IMMEDIATELY.<br />
ALL WORK TO BE IN ACCORDANCE WITH GOOD AND ACCEPTABLE LOCAL BUILDING PRACTICE.<br />
FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED DIMENSIONS.<br />
THESE DRAWINGS TO BE READ IN ACCORDANCE WITH ENGINEERS AND CONSULTANTS DRAWINGS.<br />
ALL BUILDING BY-LAWS, HEALTH AND FIRE REQUIREMENTS TO BE STRICTLY ADHERED TO.<br />
THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CORRECT SETTING OUT OF WORK. ANY DOUBT AS TO THE<br />
ACCURACY OF BOUNDARY PEGS OR LINES TO BE REPORTED TO ARCHITECT IMMEDIATELY.<br />
FOUNDATION TO BOUNDARY WALLS NOT TO ENCROACH OVER BOUNDARY LINES.<br />
BRICKFORCE REINFORCING TO BE INSTALLED IN SUBSTRUCTURE BRICKWORK EVERY FIVE COURSES.<br />
ANT POISONING UNDER ALL SURFACE BEDS.<br />
CONTRACTOR SHALL TAKE NECESSARY PRECAUTION TO AVOID ANY DAMAGE WHATSOEVER TO EXISTING<br />
BUILDINGS AND FENCES.<br />
A<br />
CORNER / COLUMN PROTECTOR<br />
A. 40 X 40 X 3 NATURAL ANODISED ALUMINIUM ANGLE SILICONED TO<br />
PLASTERED CORNER (LENGTH 2000, UNLESS INDICATED OTHERWISE)<br />
BOTTOM TO FLOOR OR TO TOP OF SKIRTING WHERE SKIRTING PRESENT.<br />
PLASTER STRIP MESH LEGEND<br />
B. 1mm THICK x 150mm WIDE GALVANIZED MENTIS STRIP<br />
MESH 210 (OR SIMILAR & APPROVED) LAID IN PLASTER<br />
ACC. TO MANUFACTURER'S SPEC. AT JOINTS BETWEEN<br />
BRICKWORK & CONCR. COLUMNS. PAINT FINISH OVER.<br />
C. AS FOR ABOVE BUT WITH WALL TILES FINISH OVER.<br />
B<br />
UFFL<br />
FFL<br />
B.E.J.<br />
FD<br />
E.J.<br />
H/D<br />
S/STEEL<br />
RWDP<br />
FHR<br />
UNFINISHED FLOOR LEVEL<br />
FINISHED FLOOR LEVEL<br />
BRICK EXPANSION JONT (SEE DETAIL)<br />
FLOOR DRAIN<br />
EXPANSION JOINT (STRUCTURAL) (SEE DETAIL)<br />
ELECTRIC HAND DRYER<br />
STAINLESS STEEL<br />
RAIN WATER DOWN PIPE<br />
FIRE HOSE REEL<br />
CHEMIE<br />
BUILDING<br />
230600230 3050 230 1950 230740230 3050 230 3050 230600230<br />
BRICKWORK<br />
4300<br />
4300 860<br />
4560 860<br />
WINDOWS<br />
C<br />
830 230 4100 230<br />
D<br />
FINISHES TO ALL DUCTS:<br />
1. FLOOR:<br />
STEEL TROWELLED, CONCRETE SCREED, FALL TO FLOOR<br />
DRAINS<br />
SKIRTINGS:<br />
NONE<br />
WALLS:<br />
SMOOTH PLASTER & PAINT.<br />
CORNICE:<br />
NONE<br />
SOFFIT:<br />
SMOOTH PLASTER & PAINT.<br />
E<br />
4100 230 4100 230 830<br />
CONCR. COLUMNS<br />
14880<br />
ABLUTION BLOCK<br />
F<br />
G<br />
367<br />
270<br />
110<br />
50<br />
110<br />
75<br />
22<br />
H<br />
OUTSIDE<br />
1370<br />
INSIDE<br />
SCALE 1 : 10<br />
LANDSCAPING<br />
110 250 110<br />
75 85<br />
DETAIL PLAN: RWDP & CAVITY WALL<br />
CHEMIE BUILDING<br />
150Ø uPVC RWDP BUILT INTO<br />
WALL CAVITY<br />
FACEBRICK FINISH TO OUTSIDE<br />
PLASTER & PAINT BRICK WALL<br />
I<br />
SOLID TIMBER PANELS ON PINE<br />
BATTERNS FIXED TO WALL WITH<br />
ACOUSTICTREATMENT BETWEEN<br />
WALL & TIMBER<br />
250<br />
95<br />
22<br />
85 165<br />
EXISTING 110Ø<br />
SEWER PIPE<br />
J<br />
OUTSIDE<br />
INSIDE<br />
75 75 10<br />
250<br />
SCP<br />
IN-SITU CONCR. SEAT<br />
150Ø uPVC RWDP BUILT INTO<br />
WALL CAVITY<br />
SANDBLASTED IN-STU<br />
CONCRETE BY ENG.<br />
SOLID TIMBER PANELS ON PINE<br />
BATTERNS FIXED TO WALL WITH<br />
ACOUSTICTREATMENT BETWEEN<br />
WALL & TIMBER<br />
DETAIL PLAN: RWDP & CONCRETE WALL<br />
SCALE 1 : 10<br />
<br />
<br />
<br />
<br />
475/10<br />
<br />
As indicated<br />
<br />
04/22/10<br />
<br />
<br />
100<br />
P<br />
<br />
CM & JM<br />
<br />
BDV<br />
<br />
CM