Hotel Monaco
Hotel Monaco
Hotel Monaco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Hotel</strong> <strong>Monaco</strong><br />
Mechanical Systems<br />
• Central plant with a 187-ton scroll chiller (2 compressors, with<br />
waterside economizing) for cooling<br />
• An induced-draft cooling tower (CT) with 30-hp motor (with<br />
VSD)<br />
• Guest rooms 4-pipe fan coil units (FCUs) – Steam heat<br />
• Packaged Air Handling Unit (VAV) serving the restaurant (20<br />
tons) and lower lobby (30 tons)<br />
• The guest room make-up air is delivered by a natural gasfired<br />
make-up air unit (MAU, gas preheat when OAT