Figure 6.2 An example for laying in resistant<br />

soil<br />

Figure 6.3 An example for laying in<br />

weak soil (loess) depth ≤ 1.0 m<br />

In all cаses the sealing of the founding<br />

layer must be from 85% up to 95% according<br />

to Proctor<br />

Figure. 6.4 An example for laying in<br />

weak soil (loess) > 1.0 m<br />

0 – additional 25 cm founding layer<br />

from crushed gravel and sand or from natural<br />

gravel and crushed gravel<br />

1 – founding layer from crushed gravel<br />

and sand or from natural gravel and sand<br />

2 – bedding layer<br />

3 – geotextile<br />

6.3 Sidefill, initial backfill and final backfill<br />

Apart from a proper foundation and bedding, the soil class and density realised in the sidefill (haunching) and initial backfill are important<br />

factors in achieving a satisfactory installation of a flexible pipeline.<br />

6.3.1 Sidefill and initial backfill<br />

The criteria to select material as suitable<br />

to use as fill in the haunching zone (sidefill)<br />

and directly above the crown of the<br />

pipe (initial backfill) are based on achieving<br />

adequate soil strength and stiffness<br />

after compaction. Suitable soil material<br />

includes most graded, natural granular<br />

materials with maximum particle size not<br />

exceeding 10% of the nominal pipe diameter<br />

or 60 mm, whichever is smaller.<br />

The fill material should not contain foreign<br />

matter such as snow, ice or frozen<br />

earth clumps.<br />

Figure 6.5 Pipeline section<br />

a – main backfill<br />

b – cover depth<br />

c – pipe zone<br />

d – bedding (if required)<br />

e – foundation (if required)<br />

Table 3.1 Characteristics of the<br />

materials for covering around<br />

the pipe and backfill<br />

COVERING AROUND THE PIPE’S ZONE AND FOLLOWING BECKFILL<br />

Material<br />

Gravel,<br />

Crushed stones<br />

Particles diameter<br />

[mm]<br />

8-22, 4-16<br />

8-12, 4-8<br />

Gravel 2-20<br />

Sand,<br />

Moraine gravel<br />

0.2-20<br />

Notes<br />

The most appropriate soil material, maximum<br />

5 to 20% particles with size of 2 mm<br />

Appropriate soil material, maximum, 5 to 20%<br />

particles with size of 0,2 mm<br />

Relatively appropriate soil material, maximum 5%<br />

particles with size of 0,02 mm<br />