Minden's Active Transportation Plan - Haliburton County Community ...
Minden's Active Transportation Plan - Haliburton County Community ...
Minden's Active Transportation Plan - Haliburton County Community ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Recommendations<br />
Downtown Improvements<br />
& Boosting Tourism<br />
There appears to be excess<br />
roadway width on Bobcaygeon<br />
Road downtown which could<br />
be given over to sidewalks,<br />
trees, benches, lighting and<br />
bike parking.<br />
Implementation Strategies Resources & Partners<br />
Review curb-to-curb dimensions and establish minimum parking<br />
and driving lane widths and minimum turning radii through town.<br />
If and when road is reconstructed excess roadway can be<br />
allocated to sidewalks & tree planted boulevard.<br />
<strong>Transportation</strong> and Works Dept.<br />
Business / Tourism Association and<br />
CIA Committee<br />
Bobcaygeon Rd. bridge over<br />
the Gull River: repair and in<br />
future, widen the bridge’s<br />
narrow walkways.<br />
Review downtown area for<br />
visual and physical<br />
obstructions on the sidewalks.<br />
Review downtown area lighting<br />
levels for pedestrian safety<br />
especially at intersections and<br />
two laneways.<br />
Pritchard Lane is an undefined<br />
roadway and parking area; it is<br />
unclear where the lane ends<br />
and parking begins, and where<br />
pedestrians should be.<br />
Review schedule for bridge re-construction, ensure AT (wider<br />
walk and space for bicycle lane) is considered in design.<br />
Perhaps minimize car lanes and re-build wider walkway.<br />
Consider closing the existing bridge walks and installing<br />
separate pedestrian bridges parallel to existing bridge.<br />
Conduct periodic walks to review visual and physical<br />
obstructions including walks in disrepair. Remove or prune up<br />
any plantings, low hanging baskets (laneway) that will grow at<br />
eye level or possibly obstruct sight lines between cars and<br />
pedestrians. Relocate any sidewalk obstructions (boxes,<br />
planters) that may restrict pedestrian flow.<br />
Conduct a night time walk with stakeholders to review lighting<br />
levels. Where possible adjust fixtures and wattage of bulbs. Set<br />
out priority improvements.<br />
. Designate road curbs, and sidewalks. Explore the use of<br />
temporary curbs / planters to separate road from parking and<br />
define an area for pedestrians.<br />
Add overhead sign or archway to demarcate the pedestrian<br />
laneway entry points that link through to Bobcaygeon.<br />
<strong>Transportation</strong> and Works<br />
Business / Tourism Association<br />
CIA Committee<br />
Conservation / flood-control Authority<br />
(for reconstruction)<br />
<strong>Transportation</strong> and Works<br />
Recreation Dept.<br />
CIA Committee<br />
Business Association<br />
<strong>Transportation</strong> and Works<br />
CIA Committee<br />
<strong>County</strong> Accessibility committee<br />
Business Association<br />
<strong>Transportation</strong> and Works<br />
Recreation Dept.<br />
CIA Committee<br />
Business Association<br />
27<br />
An <strong>Active</strong> <strong>Transportation</strong> <strong>Plan</strong> for Minden www.publicspaceworkshop.ca