12.04.2015 Views

Heap leach facility design - Ausenco

Heap leach facility design - Ausenco

Heap leach facility design - Ausenco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Safely recovering precious resources<br />

After more than 100 major heap <strong>leach</strong><br />

projects in over 34 countries, <strong>Ausenco</strong> has<br />

extensive knowledge and experience in<br />

<strong>leach</strong> pad engineering.<br />

We provide a ‘cradle to grave’ service. We’re there<br />

when you first consider the feasibility of a<br />

<strong>leach</strong> pad, and stay with you until it’s closed<br />

and capped.<br />

We can provide expert knowledge to guide<br />

you through complex environmental and social<br />

challenges and meet increasingly stringent<br />

permitting processes.<br />

We offer:<br />

• more than 400 registered civil and<br />

geotechnical engineers, professional<br />

geologists, engineering geologists,<br />

hydrogeologists, environmental and social<br />

specialists, certified engineering technicians,<br />

field and laboratory technicians, and<br />

registered structural engineers<br />

• qualified engineering technicians,<br />

many of whom have completed NICET<br />

registration, ACI, MSHA, and OSHA 40-hour<br />

training requirements<br />

• Spanish, Portuguese and English<br />

speaking staff.<br />

Our skills in both <strong>design</strong> and Certified Quality<br />

Auditor (CQA) services provide the foundations<br />

for innovative, well-engineered projects that<br />

maximise your investment. We can provide:<br />

• site selection, evaluation and<br />

feasibility studies<br />

• conceptual, basic and detailed engineering<br />

• geotechnical and geological studies<br />

• non-destructive geoelectric surveys<br />

• hydrology and hydrogeology services<br />

• environmental studies<br />

• construction management, construction<br />

quality assurance, and resident engineering<br />

• decommissioning, closure, and reclamation<br />

plans and monitoring<br />

• operations planning<br />

• forensic investigations<br />

• heap <strong>leach</strong> technology for the treatment of<br />

nickel laterites, particularly in remote and<br />

high rainfall areas.<br />

Named as one of the top 200 environmental<br />

firms by Engineering News-Record (ENR)<br />

magazine four years in a row, we continue to<br />

help our clients to minimise their environmental<br />

impact and build a more sustainable future.<br />

02<br />

01<br />

Pierina Gold Mine, Huaraz, Peru<br />

02<br />

Escondida Copper Mine,<br />

Antofagasta, Chile

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!