Email: pstinpti@yahoo - National Power Training Institute
Email: pstinpti@yahoo - National Power Training Institute
Email: pstinpti@yahoo - National Power Training Institute
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
♦ Substation Auxiliary Facilities ♦Substation Civil Design<br />
♦ Electrical Auxiliaries for EHV Substations ♦ SAT-Net<br />
64. O&M of EHV Sub-Station Vol.II<br />
200 15<br />
♦ Objective and Definition of terms related to Maintenance<br />
♦ Maintenance of <strong>Power</strong> Transformers<br />
♦ Conditions for opening up a Transformer for repairs<br />
♦ Condition Monitoring of Transformers by DGA<br />
♦ Preventive Maintenance Schedule of Substation Main Equipments<br />
♦ Maintenance Records of substation main equipments<br />
♦ Technical Specifications and tables<br />
65. <strong>Power</strong> System Studies and Load dispatch<br />
350 20<br />
♦ <strong>Power</strong> Flow Studies ♦ Case Study of Load Flow on a 19 bus System<br />
♦ Steady State Fault Analysis ♦ Case study of Fault Analysis on 19 Bus System<br />
♦ <strong>Power</strong> System Stability ♦ Case studies of <strong>Power</strong> System Stability<br />
♦ Principles of <strong>Power</strong> System Operation ♦ Reactive <strong>Power</strong> Control & Management<br />
66. Modernisation of <strong>Power</strong> Distribution by Birinchi<br />
595 40<br />
♦ Introduction to Distribution Sector ♦ Distribution Systems<br />
♦ Distribution Line – Construction Practices ♦Underground <strong>Power</strong> Cables<br />
♦ Earthing Practices ♦ High Voltage Distribution system<br />
♦ Modernisation of Distribution Systems ♦ Energy Audit Methodologies<br />
♦ I.T. Initiatives in Electricity Distribution Systems<br />
♦ Model Functions and Duties for accountability ♦ Important Technical Tables<br />
67. Energising your <strong>Power</strong> Utility 395 30<br />
68. Hydro <strong>Power</strong> : An Indian Perspective 1000 60<br />
69. Hydro Environment Interface 950 60<br />
70. Silting Problems in Hydro <strong>Power</strong> Plants & their Possible solutions 495 40<br />
71. Uprating and Refurbishment of Hydro <strong>Power</strong> Plants 495 40<br />
72. Journal on ERC Orders – 2 nd Edition 595 40<br />
The following rebates can be offered for purchase of our publications<br />
25 copies and above 10%<br />
50 copies and above 20%<br />
100 copies and above 25%<br />
200 and above 30%<br />
1. Packing and forwarding charges Rs.20/- per book payable<br />
2. Special offer – The rebate of 10% will be given on the total cost if the order exceeds<br />
Rs.10,000/-<br />
3. The payment may be made through demand Draft in favour of “<strong>Power</strong> Systems <strong>Training</strong><br />
<strong>Institute</strong>” payable at Bangalore.<br />
****