CLAUSES OF CONTRACT - Delhi Jal Board
CLAUSES OF CONTRACT - Delhi Jal Board
CLAUSES OF CONTRACT - Delhi Jal Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
measurement of works and whenever so required by the Engineer-in-<br />
Charge by a notice as aforesaid and shall also note down instructions<br />
conveyed by the Engineer-in- Charge or his designated representative<br />
in the site order book and shall affix his signature in token of noting<br />
down the instructions and in token of acceptance of measurements.<br />
There shall be no objection if the representative/agent looks after<br />
more than one work and not more than three works in the same<br />
station provided these details are disclosed to the Engineer-in-Charge<br />
and he shall be satisfied that the provisions and the purpose of this<br />
clause are fulfilled satisfactorily.<br />
if the Engineer-in-Charge, whose decision in this respect is final and<br />
binding on the contractor, is convinced that no such technical<br />
representative or agent is effectively appointed or is effectively<br />
attending or fulfilling the provision of this clause, a recovery shall be<br />
effected from the contractor as specified in Schedule ‘F’ and the<br />
decision of the Engineer-in-Charge as recorded in the site order book<br />
and measurement recorded in Measurement Books shall be final<br />
an 5 1’binding on the contractor. Further if the contractor fails to<br />
appoint a suitable technical representative or responsible agent and if<br />
such appointed persons are not effectively present or do not discharge<br />
their responsibilities satisfactorily, the Engineer-in-Charge shall have<br />
full powers to suspend the execution of the work until such date as a<br />
suitable agent is appointed and the contractor shall be held<br />
responsible for the delay so caused to the work. The contractor shall<br />
submit a certificate of employment of the technical<br />
representative/responsible agent along with every on account<br />
bill/fixed bill and shall produce evidence if at any time so required by<br />
the Engineer-in-charge.<br />
ii)<br />
The contractor shall provide and employ on the site only such<br />
technical assistants as are skilled and experienced in their respective<br />
fields and such foremen and supervisory staff as are competent to give<br />
proper supervision to the work.<br />
The contractor shall provide and employ skilled, semiskilled and<br />
unskilled labour as is necessary for proper and timely execution of the<br />
work.<br />
The Engineer-in-charge shall be at liberty to object to and require the<br />
contractor to remove from the works any person who in his opinion