14.04.2015 Views

CLAUSES OF CONTRACT - Delhi Jal Board

CLAUSES OF CONTRACT - Delhi Jal Board

CLAUSES OF CONTRACT - Delhi Jal Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

measurement of works and whenever so required by the Engineer-in-<br />

Charge by a notice as aforesaid and shall also note down instructions<br />

conveyed by the Engineer-in- Charge or his designated representative<br />

in the site order book and shall affix his signature in token of noting<br />

down the instructions and in token of acceptance of measurements.<br />

There shall be no objection if the representative/agent looks after<br />

more than one work and not more than three works in the same<br />

station provided these details are disclosed to the Engineer-in-Charge<br />

and he shall be satisfied that the provisions and the purpose of this<br />

clause are fulfilled satisfactorily.<br />

if the Engineer-in-Charge, whose decision in this respect is final and<br />

binding on the contractor, is convinced that no such technical<br />

representative or agent is effectively appointed or is effectively<br />

attending or fulfilling the provision of this clause, a recovery shall be<br />

effected from the contractor as specified in Schedule ‘F’ and the<br />

decision of the Engineer-in-Charge as recorded in the site order book<br />

and measurement recorded in Measurement Books shall be final<br />

an 5 1’binding on the contractor. Further if the contractor fails to<br />

appoint a suitable technical representative or responsible agent and if<br />

such appointed persons are not effectively present or do not discharge<br />

their responsibilities satisfactorily, the Engineer-in-Charge shall have<br />

full powers to suspend the execution of the work until such date as a<br />

suitable agent is appointed and the contractor shall be held<br />

responsible for the delay so caused to the work. The contractor shall<br />

submit a certificate of employment of the technical<br />

representative/responsible agent along with every on account<br />

bill/fixed bill and shall produce evidence if at any time so required by<br />

the Engineer-in-charge.<br />

ii)<br />

The contractor shall provide and employ on the site only such<br />

technical assistants as are skilled and experienced in their respective<br />

fields and such foremen and supervisory staff as are competent to give<br />

proper supervision to the work.<br />

The contractor shall provide and employ skilled, semiskilled and<br />

unskilled labour as is necessary for proper and timely execution of the<br />

work.<br />

The Engineer-in-charge shall be at liberty to object to and require the<br />

contractor to remove from the works any person who in his opinion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!