SWPPP Template - Building Industry Association of Washington
SWPPP Template - Building Industry Association of Washington
SWPPP Template - Building Industry Association of Washington
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Stormwater Pollution Prevention Plan<br />
• Total site area: 3.5 acres<br />
• Percent impervious area before construction: 70 %<br />
• Percent impervious area after construction: 80 %<br />
• Disturbed area during construction: 3.3 acres<br />
• Disturbed area that is characterized as impervious (i.e., access<br />
roads, staging, parking):<br />
• 2-year stormwater run<strong>of</strong>f peak flow prior to construction<br />
(existing):<br />
• 10-year stormwater run<strong>of</strong>f peak flow prior to construction<br />
(existing):<br />
2.6 acres<br />
0.52 cfs<br />
0.72 cfs<br />
• 2-year stormwater run<strong>of</strong>f peak flow during construction: 0.55 cfs<br />
• 10-year stormwater run<strong>of</strong>f peak flow during construction: 0.75 cfs<br />
• 2-year stormwater run<strong>of</strong>f peak flow after construction: 0.38 cfs<br />
• 10-year stormwater run<strong>of</strong>f peak flow after construction: 0.58 cfs<br />
All stormwater flow calculations are provided in Appendix F.<br />
INSTRUCTIONS<br />
• Insert text for this section below (with context as per the four paragraphs<br />
example above) in the required text box.<br />
• Check the Table below to make sure all entries are complete and correct.<br />
REQUIRED TEXT<br />
The following summarizes details regarding site areas:<br />
• Total site area: acres<br />
• Percent impervious area before construction: %<br />
8