Stormwater Pollution Prevention Plan<br />

• Total site area: 3.5 acres<br />

• Percent impervious area before construction: 70 %<br />

• Percent impervious area after construction: 80 %<br />

• Disturbed area during construction: 3.3 acres<br />

• Disturbed area that is characterized as impervious (i.e., access<br />

roads, staging, parking):<br />

• 2-year stormwater run<strong>of</strong>f peak flow prior to construction<br />

(existing):<br />

• 10-year stormwater run<strong>of</strong>f peak flow prior to construction<br />

(existing):<br />

2.6 acres<br />

0.52 cfs<br />

0.72 cfs<br />

• 2-year stormwater run<strong>of</strong>f peak flow during construction: 0.55 cfs<br />

• 10-year stormwater run<strong>of</strong>f peak flow during construction: 0.75 cfs<br />

• 2-year stormwater run<strong>of</strong>f peak flow after construction: 0.38 cfs<br />

• 10-year stormwater run<strong>of</strong>f peak flow after construction: 0.58 cfs<br />

All stormwater flow calculations are provided in Appendix F.<br />

INSTRUCTIONS<br />

• Insert text for this section below (with context as per the four paragraphs<br />

example above) in the required text box.<br />

• Check the Table below to make sure all entries are complete and correct.<br />

REQUIRED TEXT<br />

The following summarizes details regarding site areas:<br />

• Total site area: acres<br />

• Percent impervious area before construction: %<br />

8