Dolphin May-Jun 2011.pdf - Jurong Shipyard Pte Ltd
Dolphin May-Jun 2011.pdf - Jurong Shipyard Pte Ltd
Dolphin May-Jun 2011.pdf - Jurong Shipyard Pte Ltd
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
YARD NEWS<br />
Cape Mollini Takes Flight<br />
Cape Mollini, a 221.62m x 29.80m x 16.40m vessel, docked at <strong>Jurong</strong><br />
<strong>Shipyard</strong> in April 2011 for a series of repairs and maintenance.<br />
The yard’s repair specialists commenced hatch repairs, steel works as well as other machinery<br />
and electrical jobs on the 2742 TEU vessel owned by MARTIME – Gesellschaft fur maritime.<br />
Before leaving the yard in <strong>May</strong>, the hull of the containership was blasted and painted to refresh<br />
her appearance.<br />
Cruising in Style<br />
Santa Cruz, a 3115 TEU container<br />
carrier owned by Zodiac Maritime<br />
Agencies <strong>Ltd</strong>, departed <strong>Jurong</strong><br />
<strong>Shipyard</strong> in <strong>May</strong> 2011 after her<br />
recharge at the yard.<br />
Major work performed on the 251.50m<br />
x 32.20m x 21.20m vessel included bow<br />
thruster overhaul, tail shaft withdrawal, steel<br />
renewal works as well as repairs on the rudder<br />
and hatch covers. After having her hull fully<br />
blasted and painted, Santa Cruz set off for her<br />
next assignment.<br />
Another happy customer leaving for her next destination.<br />
Welcoming Bernhard Sibum<br />
Owned by Reederei Bernd Sibum GmbH & Co. KG, Bernhard Sibum<br />
completed a series of successful repair jobs before departing in<br />
<strong>May</strong> 2011.<br />
Measuring 139.15m x 22.60m x<br />
11.80m, the containership was in<br />
the yard for cell guides repair, steel<br />
maintenance works, cleaning of air<br />
coolers as well as renewal of engine<br />
pipes. In addition, the 957 TEU vessel<br />
underwent load testing, overhaul of<br />
valves and polishing before blasting<br />
and painting were carried out. Bernhard Sibum in good shape. Getting ready to sail off.<br />
The Hermes Makeover<br />
<strong>Jurong</strong> <strong>Shipyard</strong> warmly welcomed Hermes, a 212.20m x<br />
29.80m x 16.67m containership, when it called on the<br />
yard for a scheduled stopover in April 2011.<br />
Major jobs performed on the 2496 TEU vessel, owned by KG PROJEX-<br />
Schiffahrtsgesellschaft mbH & Co, included steel repairs on tanks,<br />
maintenance on hull anodes and cranes, overhaul of the bow thruster and<br />
valves as well as routine cleaning and polishing. Before departing in <strong>May</strong>,<br />
Hermes received blasting on the hull and a fresh coat of paint.<br />
Hermes looking radiant after repairs.<br />
06<br />
<strong>May</strong>-<strong>Jun</strong> 2011