17.05.2015 Views

structural pest control board - Texas Department of Agriculture

structural pest control board - Texas Department of Agriculture

structural pest control board - Texas Department of Agriculture

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DEFINITIONS OF TERMS<br />

Date <strong>of</strong> Activity- Actual date activity took place. Includes preparation at <strong>of</strong>fice<br />

and on jobsite activities.<br />

Activity – Direct participation by applicator in identifying infestations,<br />

recommendations, estimates, bids, and disclosures, making contracts, submitting<br />

bids or performing services, preparing structures for fumigation, applying<br />

fumigants, and clearing structures. Applicators must actively participate in 9 <strong>of</strong><br />

the following tasks on each <strong>of</strong> three fumigations to receive credit. If an<br />

applicator participates in additional fumigations within the license year,<br />

there is no requirement to record the additional fumigations on this form.<br />

1. Inspect structure and identify <strong>pest</strong>(s) prior to fumigation<br />

2. Prepare disclosure documents pursuant to the provisions <strong>of</strong> §599.4 <strong>of</strong> the<br />

SPCS regulations<br />

3. Measure structure and calculate volume<br />

4. Calculate dosage <strong>of</strong> Fumigant<br />

5. Notify local fire or police authority as appropriate<br />

6. Secure materials left inside structure, check pilot lights & appliances<br />

7. Tarp, place snakes, or otherwise seal structure for fumigation<br />

8. Post the structure and secure entrances to the structure<br />

9. Instruct the person (guard) on duty at the site on responsibilities and safety<br />

precautions<br />

10. Provide onsite supervision during application (only one applicator per<br />

company may claim provision <strong>of</strong> onsite supervision)<br />

11. Set up equipment including splash pan and fans for<br />

12. Introduce fumigant and warning agent (if required) to the structure<br />

13. Aerate structure<br />

14. Take down tarps, remove snakes, remove locks, or otherwise remove<br />

sealing material<br />

15. Clear the structure<br />

16. Provide onsite supervision during aeration and clearing(only one<br />

applicator per company may claim provision <strong>of</strong> onsite supervision)<br />

17. Store and/or dispose <strong>of</strong> fumigant containers<br />

18. Prepare the report <strong>of</strong> fumigation required by §599.9(j) <strong>of</strong> the SPCS<br />

regulations<br />

09-01-07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!