You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EQUIPMENT<br />
G4P crane base with 4-point<br />
support for Z-cranes<br />
TVP 170mm extended<br />
stabilizer with pendulum<br />
plate<br />
AX2 separately hydraulically<br />
extendable outriggers<br />
ZS central greasing bar for linkage<br />
system on Z cranes<br />
all bearing surfaces with high-quality bronze bushes incl. greasing<br />
channels<br />
Linkage system<br />
carrying force with linkage system<br />
carrying force without linkage system<br />
advantage of linkage system on Z-cranes<br />
linkage system between column and main boom on Z-cranes<br />
- more lifting power of up to 60 % in the upper working area<br />
- constant main boom speed throughout the total working area<br />
linkage system between main boom and outer boom on L-cranes<br />
- constant power and operation speed<br />
standard equipment<br />
special equipment<br />
23