13.06.2015 Views

Experiences of biomass power and pellets in Asia

Experiences of biomass power and pellets in Asia

Experiences of biomass power and pellets in Asia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Ch<strong>in</strong>a: Biomass Fuel Switch<strong>in</strong>g <strong>of</strong> Eco-Frontier<br />

Project Overview<br />

• Type: Coal plant acquisition & replac<strong>in</strong>g coal with <strong>biomass</strong> • Site: Qianjiang, Ch<strong>in</strong>a<br />

• Total Investment: USD 160 million (expected)<br />

• Capacity: 60MW<br />

• Amount <strong>of</strong> <strong>biomass</strong> fuel needed: app. 1 million ton/yr (supported by city)<br />

Coal boiler<br />

(60MW X 3set)<br />

Coal plant<br />

Coal<br />

(210,000t/yr)<br />

Coal<br />

(210,000t/yr)<br />

Electricity<br />

(120MW)<br />

10MW (In-house)<br />

110MW<br />

(0.51RMB/kWh)<br />

Alum<strong>in</strong>um<br />

Plant<br />

Biomass <strong>power</strong> (converted)<br />

Coal<br />

Biomass<br />

Feedstock<br />

Electricity<br />

(55MW)<br />

50MW<br />

(0.75RMB/kWh)<br />

State<br />

Grid<br />

5MW (In-house)<br />

Renewable<br />

energy sales<br />

Copyright c 2012 Eco-Frontier Co. All rights reserved. 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!