Experiences of biomass power and pellets in Asia
Experiences of biomass power and pellets in Asia
Experiences of biomass power and pellets in Asia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2. Ch<strong>in</strong>a: Biomass Fuel Switch<strong>in</strong>g <strong>of</strong> Eco-Frontier<br />
Project Overview<br />
• Type: Coal plant acquisition & replac<strong>in</strong>g coal with <strong>biomass</strong> • Site: Qianjiang, Ch<strong>in</strong>a<br />
• Total Investment: USD 160 million (expected)<br />
• Capacity: 60MW<br />
• Amount <strong>of</strong> <strong>biomass</strong> fuel needed: app. 1 million ton/yr (supported by city)<br />
Coal boiler<br />
(60MW X 3set)<br />
Coal plant<br />
Coal<br />
(210,000t/yr)<br />
Coal<br />
(210,000t/yr)<br />
Electricity<br />
(120MW)<br />
10MW (In-house)<br />
110MW<br />
(0.51RMB/kWh)<br />
Alum<strong>in</strong>um<br />
Plant<br />
Biomass <strong>power</strong> (converted)<br />
Coal<br />
Biomass<br />
Feedstock<br />
Electricity<br />
(55MW)<br />
50MW<br />
(0.75RMB/kWh)<br />
State<br />
Grid<br />
5MW (In-house)<br />
Renewable<br />
energy sales<br />
Copyright c 2012 Eco-Frontier Co. All rights reserved. 13