13.06.2015 Views

m/v cougar ace

m/v cougar ace

m/v cougar ace

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTOR ANCHORAGE, ALASKA<br />

Western Alaska Zone<br />

M/V<br />

COUGAR<br />

ACE<br />

Case Study<br />

24 July-24 Aug<br />

2006


M/V COUGAR ACE<br />

Status Update – 28 Jul 06<br />

• COUGAR ACE is in US EEZ.<br />

• NOAA SSC conducting vsl drift<br />

and spill impact trajectories.<br />

Initial drift projection is 60 nm<br />

south of Atka Island by Tuesday<br />

(8/1)<br />

• Sector Anchorage (FOSC)<br />

developing distance tripwires &<br />

COA’s for O/S resources to<br />

arrest vsl’s drift rate if necessary<br />

• RP is fully cooperating with CG<br />

Adak<br />

Atka<br />

Closest Point of Land<br />

158 NM<br />

Latest Set/Drift<br />

014T at 1.9 KTS


M/V COUGAR ACE<br />

Status Update – 0700Z 04Aug 06<br />

• M/V Cougar Ace being towed on a<br />

northerly course toward Samalga<br />

Pass @ 2.5 kts<br />

• CGC Morganthau delivered salvage<br />

team & 1 add’l pump. 032100Z Aug<br />

• Water on board poses no threat to the<br />

vsl's safety or stability.<br />

• Pumping to stbd ballast tank should<br />

reduce list & provide add’l stability.<br />

• Salvage team to re-rig tow on 04 AUG.<br />

Updated ETA to Samalga Pass is<br />

1800Z Saturday, 5 Aug.


M/V COUGAR ACE<br />

Status Update – 0700Z 04Aug 06<br />

• Salvage Assets O/S<br />

– M/V Makushin Bay<br />

• Length: 136’<br />

• GT: 198<br />

– Tug Emma Foss<br />

• Length: 101’<br />

• GT: 192<br />

– Tug Sea Victory<br />

• Length: 149’<br />

• GT: 173<br />

• 7,200 BHP<br />

– M/V Redeemer<br />

• Length: 132’<br />

• GT: 196.6<br />

– Tug Gladiator enr<br />

ETA: 06Aug pm<br />

• Length: 136’<br />

• GT: 199<br />

• 7,200 BHP<br />

• CG Forces O/S<br />

– CGC Morgenthau<br />

– CGC Sycamore


M/V COUGAR ACE<br />

Status Update – 0930Z 07Aug 06<br />

• Transit through Samalga Pass<br />

uneventful. Completed Saturday a.m.,<br />

5 Aug<br />

• Vsl being towed on easterly crse @<br />

3kts to pos’n 10nm N of Unalaska<br />

Island; ETA Monday 071500Z Aug<br />

• Contracts in pl<strong>ace</strong> to ensure aerial<br />

dispersant application (ADDS Pack)<br />

w/in 10 hours, if necessary<br />

• Salvage Team making final preps to<br />

ballast vsl using hydraulic pumps vice<br />

diesel pumps due to safety concerns<br />

• No debris and oil sighted emanating<br />

from vsl during transit


M/V COUGAR ACE<br />

Status Update – 0930Z 07Aug 06<br />

ETA 071500Z Aug<br />

070600Z Aug POSIT<br />

Dutch Harbor


M/V COUGAR ACE<br />

Future Plans – 0700Z 04Aug 06<br />

• Salvors and tug operators discussing<br />

contingency plans in prep for Samalga<br />

Pass current & shallow water effects<br />

• Tug Gladiator relieve Tug Emma Foss<br />

ETA O/S Sunday 6 Aug<br />

• Unified Command primary parties:<br />

– FOSC - USCG *<br />

– SOSC - AK Dept. of Envir. Conservation<br />

(ADEC)*<br />

– Responsible Party: Mitsui O.S.K. Lines*<br />

• Stakeholders<br />

– EPA<br />

– NOAA<br />

– AK Dept of Nat Resources<br />

– Salvage co: Titan Salvage<br />

– Department of Interior<br />

– US Fish and Wildlife<br />

– AK Fish and Game<br />

– Bureau of Indian Affairs<br />

– US Forest Service<br />

– US Park Service


M/V COUGAR ACE<br />

Status Update – 0930Z 09Aug 06<br />

• Vsl moored at Wide Bay, Unalaska in<br />

order to continue previously planned<br />

salvage ops in sheltered waters<br />

• FOSC, SOSC, CG SERT and CG GST<br />

o/s Dutch Harbor<br />

• FOSC, SOSC, & Unalaska mayor<br />

completed overflt of vsl Tuesday 8<br />

Aug. No debris or oil emanating from<br />

vsl<br />

• UC held town mtg 08 Aug w/ public &<br />

commercial interests to discuss<br />

salvage/ future plans. Answered<br />

questions/ mitigated concerns


Wide Bay<br />

Mooring Buoys<br />

Dutch Harbor<br />

Cougar Ace Mooring Plan<br />

• 2 buoys w/ 12 ton anchors & 3”<br />

chain<br />

• Mooring arrangement: secured w/<br />

chain to 2 buoys - one line to stern<br />

and one to bow; tugs Sea Victory<br />

and Gladiator standing by onsite.<br />

• CPL: 500yds<br />

• Depth : 30 fm<br />

• Pollution Response Resources<br />

O/S<br />

• 24/7 small boat & crew w/<br />

sorbents to deploy 600 feet of<br />

24 inch harbor boom,<br />

•Contract personnel & eqpt incl<br />

skimmers, sorbents & temp oil<br />

storage facilities<br />

• SORS(CGC Sycamore)


M/V COUGAR ACE<br />

Future Plans – 0930Z 09Aug 06<br />

• Dewater car deck #9 and reballast<br />

stbd #5 ballast in effort to right vsl<br />

allowing for complete inspection<br />

& assessment<br />

• Keep residents & stakeholders<br />

apprised of situation & plans thru<br />

scheduled mtgs<br />

• Upon completion of inspection,<br />

vsl transited to Portland OR under<br />

its own power to offload vehicles<br />

and complete class surveys.<br />

• Develop demobilization plan for<br />

resources not needed


M/V COUGAR ACE<br />

15 Aug 06 salvage effort<br />

12 AUG 57 Degree List 14 AUG 18 Degree List<br />

• Salvors report ship is safely afloat, stable,<br />

and within normal operational limits.


M/V COUGAR ACE<br />

16 Aug 06 vehicle damage


RO/RO COUGAR ACE<br />

–BEFORE –<br />

–AFTER –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!