03.07.2015 Views

PETRA III - Desy

PETRA III - Desy

PETRA III - Desy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PETRA</strong> <strong>III</strong>: Beamlines and radiation safety hutches<br />

Max. beamline length within the<br />

Experimental hall: 103 m<br />

finished<br />

finished<br />

finished<br />

• 28 hutches installed within 10 month<br />

- 14 optics enclosures (heavy concrete)<br />

- 16 hutches for experiments (EH)<br />

• 7 EHs under construction<br />

Edgar Weckert | WA | 18. June 2009 | Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!