08.07.2015 Views

INTEC Sales Meeting June 27-28, 2013 - INTEC Engineering GmbH

INTEC Sales Meeting June 27-28, 2013 - INTEC Engineering GmbH

INTEC Sales Meeting June 27-28, 2013 - INTEC Engineering GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Vertical TO-Heater (down-firing) Vertical casing mounted on a base frame Inner coil anchored to casing on top side, outer coilsupported on bottom side End of combustion chamber equipped with refractorylining respectively oil-cooled turning plate Cover plate removable (lifting tools) Thermal oil headers can be user-defined arranged Flue gas outlet located on lower end of casing Sight glass from cover side Drains for tube coil on bottom side11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!