CIArb Costs of International Arbitration Survey 2011
CIArb Costs of International Arbitration Survey 2011
CIArb Costs of International Arbitration Survey 2011
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. In which <strong>of</strong> these roles are you responding to this survey?<br />
Representative <strong>of</strong> party<br />
Tribunal member<br />
2. What was the nature <strong>of</strong> the dispute?<br />
Shipping/Maritime<br />
General Commercial<br />
Construction/Engineering<br />
Oil/Gas/Energy<br />
IP/Technology<br />
3. When was the start date <strong>of</strong> the proceedings?<br />
Date:_______Month: _______Year:_______<br />
And the end date?<br />
Date:_______Month: _______Year:_______<br />
4. Where was the seat <strong>of</strong> arbitration?<br />
UK<br />
Continental Europe<br />
USA<br />
Central/South America<br />
Middle East<br />
5. Which arbitral institution administered this arbitration?<br />
ICC<br />
LCIA<br />
LMAA<br />
AAA<br />
SCC<br />
Former CIS<br />
Indian Sub-Continent<br />
Far East<br />
Australasia<br />
Other<br />
AD HOC<br />
Other<br />
EDITED VERSION OF WEB-BASED SURVEY FORM<br />
6. For the following questions, please convert the amount into UK Sterling<br />
(Pounds) at the current rate <strong>of</strong> exchange.<br />
6.a Value claimed:<br />
Less than £1m<br />
£1m to £10m<br />
£10m to £50m<br />
£50m to £100m<br />
More than £100m<br />
6.b Amount awarded:<br />
Less than £1m<br />
£1m to £10m<br />
£10m to £50m<br />
£50m to £100m<br />
More than £100m<br />
6.c Value counter-claimed:<br />
Less than £1m<br />
£1m to £10m<br />
£10m to £50m<br />
£50m to £100m<br />
More than £100m<br />
6.d Amount awarded:<br />
Less than £1m<br />
£1m to £10m<br />
£10m to £50m<br />
£50m to £100m<br />
More than £100m<br />
<strong>CIArb</strong> COSTS OF INTERNATIONAL ARBITRATION SURVEY <strong>2011</strong> | 19