10.07.2015 Views

Evaluating costs and benefits of model-based development of ... - ESI

Evaluating costs and benefits of model-based development of ... - ESI

Evaluating costs and benefits of model-based development of ... - ESI

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Statements about the econometricsCase study participants report about positive impacts on the econometricsStatements about changes in the econometrics because <strong>of</strong> MBSDCostsTimeProductqualityEarlier error detection because <strong>of</strong> the use <strong>of</strong> simulations, highautomation degree <strong>and</strong> easier communication. The highest cost savingpotential is seen in the reuse <strong>of</strong> function <strong>model</strong>s over different carlinesEarlier error detection because <strong>of</strong> the use <strong>of</strong> simulations, highautomation degree <strong>and</strong> easier communication. The highest cost savingpotential is seen in the reuse <strong>of</strong> function <strong>model</strong>s over different carlinesFunctions have a higher maturity level Impact on the maintenanceParticipants report improvements <strong>of</strong> the quality criteria reliability,usability, maintainability <strong>and</strong> portabilityInteresting cognition: The domain has no impact on cost, time <strong>and</strong> quality changes. Thishas even been confirmed by a case study participant, who has made this experience inseveral projects in different domains14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!