10.07.2015 Views

Operation - Gaston Battery Industrial Ltd.

Operation - Gaston Battery Industrial Ltd.

Operation - Gaston Battery Industrial Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

sulphuric acid. But if batteries are broken in transportation or unloading, wash cauterizedskin and/or eyes with plenty of water immediately, and the person should be sent to hospitalas quickly as possible.! The batteries system should be installed nearer to the load as possible as it can, in orders toavoid voltage drop of the wire.! After installation, check again the system voltage, the polarity of positive and negative postto ensure the correct installation.3. Installation Procedure3.1 Check battery to assure no damage after unpacking, check accessory against packing list toassure completeness.3.2 Installation of battery frame3.2.1 Installation of vertical battery frameFor example, install (48V) system.a) As per Fig. 3-1, fix foot-board, two side-boards and one shelf-board with M8 bolts. Finishinstallation of first-floor battery frame.b) According to Fig. 3-2, fix two side-boards, one shelf-board, first floor side frame, finish10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!