10.07.2015 Views

Material Inspection and Quality Assurance in India - TCR ...

Material Inspection and Quality Assurance in India - TCR ...

Material Inspection and Quality Assurance in India - TCR ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Inspection</strong> <strong>and</strong> <strong>Quality</strong> <strong>Assurance</strong> <strong>in</strong> <strong>India</strong><strong>Inspection</strong> Procedure followed by <strong>TCR</strong> Eng<strong>in</strong>eer<strong>in</strong>g1. Follow<strong>in</strong>g <strong>in</strong>formation is sought from vendor / buyer on whose behalf<strong>in</strong>spection is to be carried out: Name, Address, Telephone & Fax No of Vendor. Details of <strong>Material</strong>s ordered along with specification (IS/BS/ASTM etc). Details, Quantity, any special requirement <strong>and</strong> test<strong>in</strong>g requirements. Sampl<strong>in</strong>g plan, if any.2. <strong>TCR</strong>’s <strong>in</strong>spection department will then get <strong>in</strong> touch with the supplier toascerta<strong>in</strong> availability of material for <strong>in</strong>spection. If available, an <strong>in</strong>spection visitis fixed with<strong>in</strong> 24 hours.3. <strong>TCR</strong> <strong>in</strong>spector would carry out normal visual <strong>in</strong>spection (captur<strong>in</strong>g detailed sizemeasurements) <strong>and</strong> mark each <strong>and</strong> every item (or r<strong>and</strong>om sampl<strong>in</strong>g, asspecified by the client) with some “identification” number or <strong>TCR</strong> TestCertificate Number (if material test<strong>in</strong>g is ordered as well) <strong>and</strong> <strong>TCR</strong> Stamp.Extra stamp<strong>in</strong>g would be done on materials r<strong>and</strong>omly drawn for test<strong>in</strong>g as persampl<strong>in</strong>g plan of the buyer. If no specific sampl<strong>in</strong>g plan is given by the buyer,it is normal practice of <strong>TCR</strong> to draw a m<strong>in</strong>imum of 2 No. of samples <strong>and</strong> oneadditional sample for each 10 Nos. This ensures assessment of uniformity ofthe lot. <strong>TCR</strong> <strong>in</strong>spector will also mark the material from which requisite length ofsample is to be cut.4. If the samples are to be cut by the vendor; the same must be delivered to<strong>TCR</strong>’s Lab ensur<strong>in</strong>g that <strong>TCR</strong> stamp numb. & identification mark<strong>in</strong>gs are <strong>in</strong>tact.5. <strong>TCR</strong> will test the sample when delivered to its lab <strong>and</strong> carry out all tests asrequired by the buyer. Step by step tests are also carried out at the request ofvendor who is not too sure of the quality <strong>and</strong> does not want all tests to becarried out if the material is not meet<strong>in</strong>g some requirements. Test <strong>in</strong> suchcases are stopped once it is established that sample is fail<strong>in</strong>g <strong>in</strong> certa<strong>in</strong> test.Please note that this may delay the job.6. All samples drawn from a particular lot must pass all the tests, which arerequired by the buyer. If any sample fails, the entire lot is rejected <strong>and</strong> then <strong>in</strong>order for acceptance, the vendor must agree to test each <strong>and</strong> every bar / plateof the lot to be tested <strong>in</strong> respect of the failed test. All samples pass<strong>in</strong>g the testonly will be cleared for dispatch. A test certificate is issued confirm<strong>in</strong>g theacceptance of the sample <strong>and</strong> material.7. All bills for test<strong>in</strong>g & <strong>in</strong>spection charges are normally raised on to the vendor<strong>and</strong> the buyer may reimburse the same to the vendor for all acceptedmaterials.8. All materials dispatched from the vendor to the buyer must carry <strong>TCR</strong> stamp<strong>and</strong> Serial / TC Number, so that it can be easily co-related by the <strong>in</strong>spectiondepartment of the buyer.9. In case of failure, vendor is advised to offer a new lot <strong>and</strong> entire procedure isrepeated once aga<strong>in</strong>. In case of m<strong>in</strong>or deviation from st<strong>and</strong>ard specification,vendor may get clearance from the buyer <strong>and</strong> such clearance is to be directlycommunicated to <strong>TCR</strong> by the buyer. Such items can then be cleared fordispatch.August 08 Page 4 of 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!