Performance of the Essential FacilitiesHospitals: Performance of Hospitals was not acceptable. Main Heriss hospital with RC moment resistingframe experienced small structural damage due to occurrence ofplastic hinge and failure of many columnsnear to beam-to-column joint, as shown in Figure 12. All of the observed plastic hinges were located inthe columns of the first floor. Some of the columns experienced shear cracks next to the openings of theinfill walls. In additi<strong>on</strong> to the abovementi<strong>on</strong>ed failures, as shown in this figure, diag<strong>on</strong>al cracks observedin some of the beams net to the column joint. It seems that the main reas<strong>on</strong> for unacceptable performanceof the structural system was poor quality of c<strong>on</strong>structi<strong>on</strong> and low quality of c<strong>on</strong>crete. Such a performanceoccurred because of weakness of the cementitious matrix and/or in sufficient b<strong>on</strong>dage of cement pasteand the aggregates.Figure 13show shows that n<strong>on</strong>-structural damages <strong>on</strong> the hospital such as diag<strong>on</strong>alcracking and out of plane failure of infill walls, failure of facades and false ceilings were the major failuremodesof the n<strong>on</strong>-structural elements. The hospital was not operable after the earthquake. The Bagher-Al-Oloom Hospital in Ahar city also suffered remarkable n<strong>on</strong>structural damages and put out of commissi<strong>on</strong>after the earthquake [2]. In plane failure of infill walls, failure of false ceilings and overturning of medicalequipment were the major failure mode of n<strong>on</strong>-structural comp<strong>on</strong>ents in this hospital.Universities: No observable structural damage happened in universities and dormitory buildings in Ahar,Varzaghan and Herris. Several n<strong>on</strong>-structural failures occurred in educati<strong>on</strong>al and dormitory buildings ofVarzaghan Islamic Azad University. There were no human losses or injuries have been reported in theuniversities.Figure 12. Herris hospital structural damage to the: Plastic hinges <strong>on</strong> beam-columns joint and diag<strong>on</strong>alcrack of the column.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!