10.07.2015 Views

Newtech Pro Tower / Rack 6-10kVA English User Manual - Tuncmatik

Newtech Pro Tower / Rack 6-10kVA English User Manual - Tuncmatik

Newtech Pro Tower / Rack 6-10kVA English User Manual - Tuncmatik

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Safety and EMC instructionsPlease read carefully the following user manual and the safety instructions before installing the unit or usingthe unit!1-1. Transportation and StoragePlease transport the UPS system only in the original package to protect against shock andimpact.1-2. PreparationThe UPS must be stored in the room where it is ventilated and dry.Condensation may occur if the UPS system is moved directly from cold to warm environment.The UPS system must be absolutely dry before being installed. Please allow at least two hours for theUPS system to acclimate the environment.1-3. InstallationDo not install the UPS system near water or in moist environments.Do not install the UPS system where it would be exposed to direct sunlight or nearby heater.Do not block ventilation holes in the UPS housing.Do not connect appliances or devices which would overload the UPS (e.g. big motor-typeequipment)) to the UPS output sockets or terminal.Place cables in such a way that no one can step on or trip over them.Do not block air vents in the housing of UPS. The UPS must be installed in a location with goodventilation. Ensure enough space on each side for ventilation.UPS has provided earthed terminal, in the final installed system configuration, equipotentialearth bonding to the external UPS battery cabinets.The UPS can be installed only by qualified maintenance personnel.An appropriate disconnect device as short-circuit backup protection should be provided in thebuilding wiring installation.An integral single emergency switching device which prevents further supply to the load by theUPS in any mode of operation should be provided in the building wiring installation.Connect the earth before connecting to the building wiring terminal.Installation and Wiring must be performed in accordance with the local electrical laws andregulations.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!