Manistique River and Harbor•Removal was initially expected totake 3 seasons and remove 104,000cy – project took 6 seasons andremoved approxim<strong>at</strong>ely 190,000 cy.•Issues encountered in characterizingthe extent of contamin<strong>at</strong>ed sedimentand <strong>com</strong>pletely removing sedimentresiding over fractured bedrock.•Cleanup level: average PCBconcentr<strong>at</strong>ion of 10 mg/kg throughoutthe sediment column within the AOC.•Post-dredging average PCBconcentr<strong>at</strong>ions (top foot) throughoutthe site were 9.0 mg/kg (2000) and7.3 mg/kg (2001).