11.07.2015 Views

Download the document.

Download the document.

Download the document.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The need for change….• Capacity – over <strong>the</strong> last five years we have seen constantgrowth across all sectors of <strong>the</strong> organisation. This has putpressure on our cinema and <strong>the</strong>atre auditoria and on ourgallery and <strong>the</strong> public spaces serving <strong>the</strong>m. Consultationhas indicated that <strong>the</strong>re is a great demand for a fur<strong>the</strong>rground floor well-lit space for workshops and events.• Access – all entrances need to be made more accessibleand visible. Heavy doors currently make access difficultyfor users with mobility issues and Cinema Two is currentlyonly accessible for wheelchair users through a separateentrance.• Sustainability – after 36 years of constant use many parts of<strong>the</strong> building are now in a poor state of repair and <strong>the</strong>spaces have outgrown visitor and artists’ expectations anddemand. The redevelopment will enable Chapter toremain at <strong>the</strong> forefront of culture in Wales.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!