11.07.2015 Views

Project Highlights iBMS, ELV & Security - ATAL Building Services

Project Highlights iBMS, ELV & Security - ATAL Building Services

Project Highlights iBMS, ELV & Security - ATAL Building Services

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Yuen Long Factory of Nin Jiom Medicine ManufactoryClientConsultantScope of WorkDescriptionCompletion:::::Nin Jiom Medicine Mfy (HK) Ltd.David S K Au & Associates Ltd.Supply of BMS System and ATC Control for Clean RoomOne of the Nin Jiom Medicine Manufactory is situated at Yuen Long. It isresponsible for the production, management and worldwide marketing of PeiPa Koa. The factory adopts the advanced, hygienic and international standardmachineries and equipment including medicine preparation room, automaticfilling, capping machines and quality control center.2012KMB Lai Chi Kok DepotClientConsultantScope of WorkDescriptionCompletion:::::Kowloon Motor Bus Co. Ltd.J. Roger Preston Ltd.Supply of BMS, ATC & DVR SystemThe KMB Lai Chi Kok environmentally-friendly Bus Depot located at No.100,Hing Wah Street West in West Kowloon, has a total construction area of54,000 m². The Depot is purpose-built to provide maintenance for 1,000 busesin the West Kowloon and Southwest New Territories regions.2002Suzhou AMD Testing & Enclosed Packaging PlantClientConsultantScope of WorkDescriptionCompletion:::::AMD, USANo.11 Design Institute of Electronic Industry MinistrySupply & Installation of BMS & ATC SystemHAECO’s Component and Avionics Overhaul (CAO) facility located at TseungKwan O Industrial Estate, is a purpose-built building with 7,000 m² of usablespace offering the services of CAO workshops and Calibration & MetrologyCentre. All of the provided services are validated by high quality standard ofISO 9001 certification.1999HAECO Component and Avionics Overhaul (CAO) FacilityClientConsultantScope of WorkDescriptionCompletion:::::Hong Kong Aircraft Engineering Co. Ltd.Meinhardt (M&E) Ltd.Supply & Installation of BMS & ATC SystemHAECO’s Component and Avionics Overhaul (CAO) facility located at TseungKwan O Industrial Estate, is a purpose-built building with 7,000 m² of usablespace offering the services of CAO workshops and Calibration & MetrologyCentre. All of the provided services are validated by high quality standard ofISO 9001 certification.199830

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!