11.07.2015 Views

South Limestone Streetscape Plan.pdf

South Limestone Streetscape Plan.pdf

South Limestone Streetscape Plan.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>South</strong> <strong>Limestone</strong> Street CorridorConceptual <strong>Streetscape</strong> Master <strong>Plan</strong>Springfield, OhioFebruary 25, 2003<strong>South</strong> <strong>Limestone</strong> Corridor


Presentation Outline• Introduction• Existing Conditions Analysis• Corridor Vision• Opinion of Investment• Next StepsPresentation Outline


Introduction<strong>South</strong> <strong>Limestone</strong> Corridor


Context MapI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaIntroduction<strong>South</strong> <strong>Limestone</strong> CorridorStudy Area


Existing Conditions Analysis<strong>South</strong> <strong>Limestone</strong> Corridor


Corridor Study AreaI-70I-70Grand AvenuePrairie AvenueJohn StreetLeffel LaneSelma RoadS. <strong>Limestone</strong> StreetW. Perrin Ave.Existing Conditions


General Corridor Characteristics• Major gateway corridor to the City (1.9 miles)• Interstate exit provides first impression of city for many visitors• Mixed-use corridor with distinct land use zones• Lack of unified community identity (interstate to high school)• Heavily auto-oriented commercial area (pavement dominated)• Lack of ‘greenscape’ – especially in commercial zones• Abundance of sign types – visually cluttered• Intimidating to pedestrian• Grand “Main Street” architecture in residential neighborhoodsExisting Conditions


Land Use Character ZonesCenter CityGatewaySelma RoadGrand AvePerrin Ave.ResidentialPrairie AveS. <strong>Limestone</strong> StreetJohn StreetCommunityCommercialInterstateCommercialLeffel LaneI-70InterstateGatewayExisting Conditions


Characteristics of Interstate Gateway• Typical interstate interchange –no character• No sense of arrival• Vast open area – scale issue• “Blank canvas” – hugeopportunity to create an identity• Small-scale entry feature forwidth/type of road• No distinct communitycharacter represented• Typical interstate commercialappearance at city entryExisting Conditions


Characteristics of Interstate Commercial• Visually cluttered arrival• Lack of aesthetic character• Little useable/contributinggreenspace (tree lawn)• Improved traffic signal mast arms• Tall interstate signs• Opportunity for median upgrade &image buildingExisting Conditions


Characteristics of Community Commercial• Lots paved to right-of-way• Devoid of useable ‘greenspace’ (notree lawn or planting area)• No parking lot screening• Signage competition & conflicts• Improved building location on this site(closer to street)• Attempt at parking lot screening &street trees• Wall sign rather than pole signExisting Conditions


Characteristics of Community Commercial• Deep building setback• Large front parking field• Improved parking lot screening here• Pole sign• Opportunity for median• Site entry feature landscaping• Uncomfortable sidewalk location forpedestrians• Community banner can’t competewith scale of signageExisting Conditions


Characteristics of Residential• Architecturally “rich” residentialdistrict• Great potential for renovation• Strengthens corridor character• Mature trees• More appealing street envelope• Opportunity for median to reinforceresidential scaleExisting Conditions


Characteristics of Residential• Example of strong, existingarchitecture character• Opportunity for street tree infill• Narrow (2’) tree lawn• Potential to “wrap” streetscapeimprovements down side streets• Side streets offer neighborhoodgateway opportunitiesExisting Conditions


Characteristics of Center City Gateway• Natural Center City gateway• Potential to match interstate gateway– create common corridor identity• Median improvement opportunity• Potential to use Center City as focalpoint• Transition point to mark entrance tocity coreExisting Conditions


Corridor Vision<strong>South</strong> <strong>Limestone</strong> Corridor


Leffel LaneI--70Overall Corridor VisionS. <strong>Limestone</strong> StreetGrand AvenueJohn StreetPrairie AvenueSelma RoadW. Perrin Ave.Corridor Vision


I-270I-70Leffel LaneRR TracksHigh St.Interstate Gateway LocationI-270Grand AvePrairie AveJohn StreetRR TracksSelma RoadS. <strong>Limestone</strong> StreetPerrin Ave.Corridor Vision


Sample Interstate Character PhotosCorridor Vision


Interstate Gateway ImprovementsI-70Elements:I-270• Raised <strong>Plan</strong>ting Areas• Ornamental Tree Grove• Flower Beds• Slope <strong>Plan</strong>ting Area• Tree Rows• Enhanced Entry FeatureTracksRRHigh St.RR TracksI-270S. <strong>Limestone</strong> StreetPrimaryStudy AreaCorridor Vision


Existing Interchange (looking south)I-270RR TracksPrimaryStudy AreaCorridor Vision


Proposed InterchangeI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Existing Entry SignI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Entry Sign Improvements ExampleI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Existing Interstate EntryI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


I-270RR TracksHigh St.Proposed Interstate EntryI-270RR TracksCorridor Vision


I-70Leffel LaneInterstate Commercial LocationGrand AvePrairie AveJohn StreetSelma RoadS. <strong>Limestone</strong> StreetRoad Name?Road Name?Perrin Ave.<strong>Limestone</strong> RoadCommunityCommercialCorridor VisionInterstateCommercial


Sample Character PhotosCorridor Vision


Interstate Commercial ImprovementsElements:• Landscape Easements• Street Tree Infill• Buffer/Screening• Pedestrian Improvements• Some Shared Access/Closed Curb Cuts• New Street/PedestrianLightingExistingCorridor VisionProposed


I-70el LaneLeffCommunity Commercial LocationGrand AvePrairie AveJohn StreetSelma RoadS. <strong>Limestone</strong> StreetRoad Name?Road Name?Perrin Ave.<strong>Limestone</strong> RoadCommunityCommercialCorridor VisionInterstateCommercial


Community Commercial ImprovementsElements:• Landscape Easements• Street Trees• ImprovedPedestrian Area• Buffer/Screening• New Street/PedestrianLighting• Cross AccessTracksRRI-270ExistingRR TracksLong-term:• Building Infill &Parking RelocationCorridor VisionProposed


Community Commercial Improvements – Additional InfillElements:• Landscape Easements• Street Trees• ImprovedPedestrian Area• Buffer/Screening• New Street/PedestrianLighting• Cross AccessTracksRRI-270ExistingRR TracksLong-term:• Building Infill &Parking Relocation• Additional Densitythrough SharedRear Lot ParkingCorridor VisionProposed Alternate


Community Commercial ImprovementsRR TracksExistingPhase 2 Improvements(add Median)Phase 1 Improvements(Street Trees, Monument Signs, Screened Parking)Phase 2 Alternative Improvements(flip Sidewalk)Corridor Vision


Existing Community CommercialI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


I-270RR TracksHigh St.Phase 1 ImprovementsI-270RR TracksCorridor Vision


Phase 2 ImprovementsI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Phase 2 Improvements AlternativeI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


I-70el LaneResidential LocationGrand AvePrairie AveLeffJohn StreetSelma RoadS. <strong>Limestone</strong> StreetPerrin Ave.Corridor Vision


Sample Residential Character PhotosPrimaryStudy AreaCorridor Vision


Residential Improvement <strong>Plan</strong>Elements:• Landscape Easements• Street Tree Infill• Landscaped Median• Buffer/Screening• Pedestrian Improvements• New Street/PedestrianLightingExistingCorridor VisionProposed


Residential ImprovementsExistingProposed Improvements(Infill trees, add median)PrimaryStudy AreaCorridor Vision


Existing ResidentialI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Proposed Residential ImprovementsCorridor Vision


Proposed Residential ImprovementsCorridor Vision


Existing Residential Side StreetI-270I-270RR TracksHigh St.RR TracksPrimaryStudy AreaCorridor Vision


Proposed Residential Side StreetI-270Corridor Vision


Proposed Residential Side Street with MedianI-270Corridor Vision


Potential Corridor Identity MarkerCorridor Vision


I-70el LaneCenter City Gateway LocationGrand AvePrairie AveLeffJohn StreetSelma RoadS. <strong>Limestone</strong> StreetPerrin Ave.Corridor Vision


Center City GatewaySelma RoadS. <strong>Limestone</strong> StreetCorridor Vision


Opinion of Probable Investment<strong>South</strong> <strong>Limestone</strong> Corridor


Probable Investment – Interstate GatewayLandscape(grade, soil, seed, trees, bulbs, etc.)IrrigationMonument SignDecorative FencingLightingTraffic ControlTotal (w/ 15% contingency)$360,250$217,500$25,000$25,000$80,000$10,000$825,500Interstate Gateway


Probable Investment – Commercial CorridorPhase 1: Street TreesDemolition(pavement removal)Landscape(soil, prep, seed, street tree)Street LightingTotal (w/ 15% contingency)$37,500$108,500$56,000$232,300* Additional components could includesidewalk / tree lawn alternative, signrelocation assistance & cross accesscreation.Commercial Zones


Probable Investment – Commercial CorridorPhase 2: MedianDemolition(pavement removal)Traffic ControlHardscape(median curb)Landscape(soil, seed, trees)IrrigationTotal (w/ 15% contingency)$27,000$10,000$72,000$57,200$54,200$253,460Commercial Zones


Probable Investment – Residential CorridorPhase 1: Street Edges & MedianDemolition(pavement removal)Traffic ControlHardscape(median curb)Landscape(grade, soil, seed, trees, bulbs, etc.)IrrigationStreet LightsTotal (w/ 15% contingency)$48,300$10,000$130,000$109,300$60,800$192,000$632,960Residential Zone


Probable Investment – Residential CorridorPhase 2: Side Street EntrancesDemolition (pavement removal)Traffic ControlHardscape (median curb)Landscape(grade, soil, seed, trees, bulbs, etc.)IrrigationTotal (w/ 15% contingency)$19,500$5,000$52,000$46,300$71,500$223,500Residential Zone


Next Steps<strong>South</strong> <strong>Limestone</strong> Corridor


Next Steps• Prioritization I-270 of ImprovementsI-270• Create Overlay Zoning District (protect investment)• Investigate Grant Sources• Fund ProjectRR Tracks• Develop Design & Construction Documents• Build Project (Phases)High St.RR TracksPrimaryStudy AreaNext Steps


Applicability to Other Corridors<strong>South</strong> <strong>Limestone</strong> Corridor


Other Important Springfield CorridorsI-270N. <strong>Limestone</strong>/ St. Rt. 72I-270RR TracksTroy Rd./ St. Rt. 41High St.RR TracksE. Main St./ US Rt. 40W. Main St./ US Rt. 40PrimaryStudy AreaE High St./ St. Rt. 41Applicability to Other Corridors


Common <strong>Streetscape</strong> Elements for Springfield Corridors• Interchange Enhancement (city identity)• City Gateway Identification Reflecting City Character• Street Trees (w/views under canopy and consistent species patterning)• Adequate Tree Lawn/Street-Side <strong>Plan</strong>ting Strip (further separating street & sidewalk)• Landscape Screening for Parking Lots• Controlled Curb Cuts & Cross Access Easements• Unified <strong>Streetscape</strong> Elements (materials, street & pedestrian light fixtures, mast arms,banners, directional signs, benches, bus shelters, etc.)• Parking Fields to Rear /Buildings Forward (when redeveloping site in urban areas)• Landscaped Medians (where possible, gateway entrances)• Ground-Mounted Signs (with attractive base & landscaping)Common <strong>Streetscape</strong> Elements


Project Benefits<strong>South</strong> <strong>Limestone</strong> Corridor


Benefits of <strong>Limestone</strong> Corridor Improvement• Create positive, unique image for Springfield• Provide enhanced gateway to the city• Contribute to pride in commercial & residential neighborhoods• Add to the value of properties within corridor• Encourage new investment• Protect public & private investment in corridor• Indicates city commitment to corridorProject Benefits


Thank You<strong>South</strong> <strong>Limestone</strong> Corridor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!