- Page 1 and 2: Best Practice Procurement- Engineer
- Page 3 and 4: Introduction (cont‟d)Barriers to
- Page 6 and 7: Introduction (cont‟d)Causes of th
- Page 10 and 11: Introduction (cont‟d)Best Interes
- Page 12 and 13: Dire Consequences:„Appointingthe
- Page 14: Unskilled firm for the right job“
- Page 17 and 18: Under-resourced firm is a …We can
- Page 19 and 20: - Solution -Use of Quality principl
- Page 21 and 22: 1.1Consulting Engineers South Afric
- Page 23 and 24: Consulting Engineers South AfricaRo
- Page 25 and 26: 1.2Consulting Engineering Industry
- Page 27 and 28: Consulting Engineering Industry Ove
- Page 29 and 30: The World Without Engineers
- Page 31 and 32: Construction Industry Enabler and R
- Page 33 and 34: Construction Industry Enabler and R
- Page 35 and 36: Construction Industry Enabler and R
- Page 37 and 38: The Project Life Cycle9Disposal /Re
- Page 39 and 40: The Project Life CycleThe Project L
- Page 41 and 42: Fee income earned by Sub-discipline
- Page 43 and 44: Overview of Consulting Engineering
- Page 45 and 46: How to Procure EngineeringServicesS
- Page 47 and 48: Procurement of Consulting Engineeri
- Page 49 and 50: TABLE : PILLARS OF PROCUREMENTSyste
- Page 51 and 52: Procurement of Consulting Engineeri
- Page 53 and 54: Procurement of Consulting Engineeri
- Page 55 and 56: Competitive Selection ProceduresPP2
- Page 57 and 58: Procurement of Consulting Engineeri
- Page 59 and 60:
Q&ATeaBreakSession 3
- Page 61 and 62:
3.1 Scope of Services
- Page 63 and 64:
Scope of ServicesScope of Services:
- Page 65 and 66:
Scope of ServicesDetailed examples
- Page 67 and 68:
Scope of ServicesKey Factors in Dev
- Page 69 and 70:
Scope of WorkPoints to Note• The
- Page 71 and 72:
Examples of Scope of Work (cont‟d
- Page 73 and 74:
Tender documentation3.2 Tender Docu
- Page 75 and 76:
Tender documentationDocuments relat
- Page 77 and 78:
Tender documentationStandard Colour
- Page 79 and 80:
Q&A LUNCH Session 4
- Page 81 and 82:
Value-added ServicesValue, Financia
- Page 83 and 84:
Value-added ServicesEngineering Ser
- Page 85 and 86:
Value-added ServicesThe Concept of
- Page 87 and 88:
Value-added ServicesGolden Rule No.
- Page 89 and 90:
Value-added ServicesAdjustments fro
- Page 91 and 92:
Value-added ServicesSpecific circum
- Page 93 and 94:
Value-added Services - Conclusion 1
- Page 95 and 96:
Evaluation of TendersSession5
- Page 97 and 98:
Evaluation of TendersReferences•
- Page 99 and 100:
Evaluation of TendersEvaluation pro
- Page 101 and 102:
Evaluation of TendersRecommended De
- Page 103 and 104:
Evaluation of TendersDefinitions &
- Page 105 and 106:
Evaluation of TendersDefinitions an
- Page 107 and 108:
Tables for Evaluation of TendersTab
- Page 109 and 110:
Tables for Evaluation of TendersTab
- Page 111 and 112:
Tables for Evaluation of TendersTab
- Page 113 and 114:
Q&AComfort BreakSession 6PERFORMANC
- Page 115 and 116:
SESSION 66.1 Performance Monitoring
- Page 117 and 118:
Performance MonitoringIntroduction(
- Page 119 and 120:
Performance MonitoringPerformance Q
- Page 121 and 122:
Performance MonitoringQuality Outco
- Page 123 and 124:
Performance MonitoringPrinciples of
- Page 125 and 126:
PERFORMANCE MONITORINGPoints to Not