11.07.2015 Views

Contemporary Issues in Project Management - PIPMG.ORG

Contemporary Issues in Project Management - PIPMG.ORG

Contemporary Issues in Project Management - PIPMG.ORG

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BIOGRAPHIESAbout the Speakers - Day 2Peter Schiemannpeter.schiemann@wsqms.comPeter is manag<strong>in</strong>g partner at Widler & Schiemann Ltd, a consult<strong>in</strong>g firm work<strong>in</strong>g <strong>in</strong> the area ofquality management <strong>in</strong> cl<strong>in</strong>ical trials and drug safety out of Zug <strong>in</strong> Switzerland. He is a pharmacistby tra<strong>in</strong><strong>in</strong>g and obta<strong>in</strong>ed his PhD <strong>in</strong> human biology both from Philipps University <strong>in</strong> Marburg,Germany. He started his career <strong>in</strong> the pharmaceutical <strong>in</strong>dustry <strong>in</strong> 1996 by jo<strong>in</strong><strong>in</strong>g Roche<strong>in</strong> Switzerland. From 1999 to 2003 he worked with PricewaterhouseCoopers as a consultant <strong>in</strong>R&D Strategy <strong>in</strong> Switzerland and the US. Dur<strong>in</strong>g this time he obta<strong>in</strong>ed his post-graduate degreeof Pharmaceutical Medic<strong>in</strong>e from the University of Basel and a cMBA on International Market<strong>in</strong>gfrom Jones International University <strong>in</strong> Colorado, USA. He re-jo<strong>in</strong>ed Roche <strong>in</strong> the US <strong>in</strong> 2003 asGlobal Plann<strong>in</strong>g Manager and moved back to Basel <strong>in</strong> 2004. In 2006 he fully dedicated his attentionto the QRM project design<strong>in</strong>g and implement<strong>in</strong>g the novel approach and <strong>in</strong> 2009 he becameglobal head of the QRM group <strong>in</strong> Roche’s Cl<strong>in</strong>ical QA.Michael Forstnermichael.forstner@roche.comDr. Michael Forstner is “Integrated Safety Risk Manager” at F. Hoffmann-La Roche <strong>in</strong> Basel.In this role his ma<strong>in</strong> duties are to develop and implement processes for the coherent andconsistent global management of drug safety risks together with his colleagues at other Rochedrug development sites. These processes <strong>in</strong>clude data driven, <strong>in</strong>tegrated safety managementplann<strong>in</strong>g, the development of <strong>in</strong>tegrated solutions for signal detection, the implementationof mean<strong>in</strong>gful benefit-risk assessment processes, and the development of methods for asystematic approach to identify<strong>in</strong>g, assess<strong>in</strong>g and improv<strong>in</strong>g drug safety risks.Michael is also the Leader of the Global Risk <strong>Management</strong> Plann<strong>in</strong>g Work Group, a crossfunctionalglobal committee with<strong>in</strong> Roche to develop, implement and oversee efficientprocesses for the development, track<strong>in</strong>g and update of risk management plans, their globalharmonization and coherence, and their comparability to US REMSs.Prior to jo<strong>in</strong><strong>in</strong>g Roche, Dr. Forstner worked <strong>in</strong> a variety of positions <strong>in</strong> pharmaceutical R&Dat Pharmacia (Nerviano, Italy) and Novartis (Basel, Switzerland), and <strong>in</strong> drug liability riskmanagement at Zurich F<strong>in</strong>ancial Services. He studied biochemistry and medic<strong>in</strong>e <strong>in</strong> Graz,Austria, holds a PhD <strong>in</strong> biochemistry from the Swiss Federal Institute of Technology Zurich,Switzerland, did postdoctoral work at UC Berkeley/Lawrence Livermore National Laboratory,California <strong>in</strong> the area of structural enzymology and biophysics, and was Assistant professor ofMolecular Structural Biology at Sveriges Lantbruksuniversitetet <strong>in</strong> Uppsala, Sweden.In his spare time, Michael loves to spend time outdoors with his children and to engage <strong>in</strong>various activities from ski<strong>in</strong>g and hik<strong>in</strong>g, to fish<strong>in</strong>g, hunt<strong>in</strong>g and garden<strong>in</strong>g. He is also an avidreader, and loves the opera and music <strong>in</strong> general.Olivier Lazarolivier.lazar@orangemail.chOlivier Lazar is a <strong>Project</strong> <strong>Management</strong> consultant, coach and tra<strong>in</strong>er. Graduate with aMaster’s degree <strong>in</strong> Strategy, <strong>Project</strong> and Program <strong>Management</strong> and an Executive MBA fromthe Lille Graduate School of <strong>Management</strong>, <strong>in</strong> addition he is Global Manager for the <strong>Project</strong><strong>Management</strong> Excellence Practice at Altran, global leader <strong>in</strong> technology and <strong>in</strong>novationconsult<strong>in</strong>g with more than 17,000 employees <strong>in</strong> 26 countries; Olivier is also Partner at Valense,<strong>Project</strong> <strong>Management</strong> experts’ worldwide network.With more than 15 years of <strong>Project</strong> and Program <strong>Management</strong> experience, both on theoperational and consult<strong>in</strong>g perspective, Olivier has worked <strong>in</strong> a large range of <strong>in</strong>dustries, fromCorporate F<strong>in</strong>ance to Aerospace or from E-bus<strong>in</strong>ess to Pharmaceutical, be<strong>in</strong>g ma<strong>in</strong>ly <strong>in</strong>volved <strong>in</strong>the implementation of <strong>Project</strong> Oriented Organizations.With a demonstrated expertise <strong>in</strong> Earned Value <strong>Management</strong>, Risk <strong>Management</strong> and Strategy,Olivier has developed the “<strong>Project</strong> Driven Strategic Cha<strong>in</strong>©” concept l<strong>in</strong>k<strong>in</strong>g the Strategic Visionto the <strong>Project</strong> operational level, develop<strong>in</strong>g a complete Governance approach. As complementaryto it, the “<strong>Project</strong> <strong>Management</strong> Office Life Cycle©” model proposes a new evolv<strong>in</strong>g approach toa PMO, adapt<strong>in</strong>g itself to the level of Maturity of an organization.He is regularly published <strong>in</strong> professional press and present <strong>in</strong> number of PM conferences aroundthe world, <strong>in</strong>clud<strong>in</strong>g PMI Global Congresses <strong>in</strong> EMEA and North America.An active member and volunteer at the <strong>Project</strong> <strong>Management</strong> Institute, Olivier is Vice Presidentat the PMI Switzerland Chapter. Also, as an International Correspondent for PMForum and PMWorld Today; he’s report<strong>in</strong>g news about projects and project management <strong>in</strong> Switzerland andacross Europe.Stuart Dickson – Effective Stakeholder <strong>Management</strong>stuart.dickson@novartis.comAs Head of Global Supply Cha<strong>in</strong> Operations and Bus<strong>in</strong>ess Systems <strong>in</strong> Novartis Vacc<strong>in</strong>es andDiagnostics, Stuart is responsible for all plann<strong>in</strong>g of supply, warehous<strong>in</strong>g and distribution,artwork and supply cha<strong>in</strong> bus<strong>in</strong>ess process development. This <strong>in</strong>cludes be<strong>in</strong>g Bus<strong>in</strong>ess ProcessOwner (BPO) for Plann<strong>in</strong>g, Data <strong>Management</strong> and Bus<strong>in</strong>ess Report<strong>in</strong>g with<strong>in</strong> the Company SAPenvironment, and the BPO for Artwork and Labell<strong>in</strong>g across the Division.Key experiences <strong>in</strong> his time with Novartis have been• Build<strong>in</strong>g the supply cha<strong>in</strong> function and capability• Lead<strong>in</strong>g supply plann<strong>in</strong>g and execution through the H1N1 Flu Pandemic• Runn<strong>in</strong>g a SAP re<strong>in</strong>forcement programme (part re-implementation)• Build<strong>in</strong>g the case for a new Artwork / Labell<strong>in</strong>g process and system (current) alongside theday-to-day runn<strong>in</strong>g of the operations of supply cha<strong>in</strong> across the Vacc<strong>in</strong>es network.Stuart jo<strong>in</strong>ed the Vacc<strong>in</strong>es division <strong>in</strong> May 2008 after nearly 20 years with GlaxoSmithKl<strong>in</strong>e. Hisprevious experience covered technical and production management, site logistics, site director,divisional supply cha<strong>in</strong> management– all for the primary (API) part of manufactur<strong>in</strong>g plus supplycha<strong>in</strong> strategy development. The latter roles were as part of the Global Logistics function.He has also acted on the boards of a supply cha<strong>in</strong> conference and a global research council,advis<strong>in</strong>g on content and structure.Stuart’s breadth of experience has given him plenty of opportunity to see <strong>in</strong> practice the resultsand implications of both effective and less effective methods of stakeholder management andthe importance of not overlook<strong>in</strong>g this key aspect of project management.Stuart holds a degree <strong>in</strong> Chemical and Process Eng<strong>in</strong>eer<strong>in</strong>g from Heriot Watt University<strong>in</strong> Ed<strong>in</strong>burgh.About the Speakers Day 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!