12.07.2015 Views

Download (PDF, 1.38MB) - Alpha Ideas

Download (PDF, 1.38MB) - Alpha Ideas

Download (PDF, 1.38MB) - Alpha Ideas

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Industry OverviewEnergy• Installed Capacity (Target / Achievement): (Source: CEA report)Programme (MW) for Achievement (MW) Installed Capacity (MW)FY 2012-13 upto March 2013 as on March 201317,956 20,623 2,23,343• Electricity Generation (Target / Achievement): (Source: CEA report)Hydro Thermal Nuclear Import TotalTarget upto March 2013MU 1,22,045 7,67,275 35,200 5,480 9,30,000Achievement upto March 2013MU 1,13,262 7,60,366 32,871 4,789 9,11,288% 93% 99% 93% 87% 98%• All India Generation for the period April 2012 to March, 2013, All India Generation was 911.65 BU compared to 876.89 BU over thelast year giving a growth of 3.96% and it is 98.03% of the target (Source: CEA report)• The Plant Load Factor (PLF) for the period from April, 2012 to March, 2013 is 69.95%, 78.50%, 40.28% for Thermal, Nuclear and Gasrespectively (Source: CEA report)• Country faced a huge Power deficit during April-March 2013 of 12,159 MW during the peak hours (Source: CEA report)• MoPNG has allowed clubbing or diversion of scarce natural gas between two or more power plants of the same company toimprove output such that the end use of the diverted gas would remain the same (Source: India Infrastructure magazine)• GAIL has been allowed by the US to ship Shale gas to India, which marks an exception to the US’s restrictive export policy. Theproject is on schedule and the first supply is expected by 2017-18 (Source: India Infrastructure magazine)Cont …..8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!