12.07.2015 Views

scope of work for municipal corporation - REEEP Toolkits

scope of work for municipal corporation - REEEP Toolkits

scope of work for municipal corporation - REEEP Toolkits

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Once the <strong>for</strong>mat <strong>of</strong> the feasibility study will be finalized, the Energy Management Firm willprepare a database on MS Excel <strong>for</strong>mat that will be filled during program implementation <strong>for</strong>the summarization <strong>of</strong> energy feasibility study results and their transmission to DISCOM and“The Consultant”.B. Implementation PhaseThe implementation phase will begin when all material, procedures and tools requested <strong>for</strong>the program operation are put in place.Investment Grade Energy Feasibility StudyThe Baseline Energy Consumption and Demand shall be determined accordingly to theAnnexure A <strong>of</strong> the per<strong>for</strong>mance contract. This contract can be found in Annex E <strong>of</strong> thepresent RFT.Street lighting componentThe energy feasibility study will be per<strong>for</strong>med by the Energy Management Firm resourcesusing the report template created during the preparation phase. They will have to go on siteand fill <strong>for</strong>ms describing the system characteristics, including:- exact number <strong>of</strong> fixtures <strong>for</strong> each selected switching point- the type <strong>of</strong> lamps and ballasts- their theoretical capacity (W)- spacing between the posts- number <strong>of</strong> burned/ dis-functioning lamps- lighting levelSurveyA survey designed to determine the power <strong>for</strong> typical fixtures <strong>for</strong> lamps and ballasts and thelighting level (in lux) should be per<strong>for</strong>med by the Municipal Corporations. Annex B <strong>of</strong> the RFTincludes a table that describes the results from tests realized on typical fixtures <strong>for</strong> otherMunicipal Corporations. The same table must be per<strong>for</strong>med <strong>for</strong> [relevant MC to fill name]Municipal Corporation, with data appropriate to the survey. The Energy Management Firmcan use these data as typical ones <strong>for</strong> the preparation <strong>of</strong> its technical and financial <strong>of</strong>fer aswell as field visit observations or other data or estimates it can derive from its previousexperience. These data will have to be updated with additional field measurement to berealized by the Energy Management Firm during the energy feasibility study.For bidding purpose, the Energy Management Firm could use the following procedure toestimate the cost <strong>for</strong> the realization <strong>of</strong> these additional measurements. The EnergyManagement Firm should clearly indicate in its technical <strong>of</strong>fer if it intends to do additionaltests to guarantee the per<strong>for</strong>mance <strong>of</strong> the proposed measure or if it will only per<strong>for</strong>m theA-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!