Managing Concurrency and Parallel Testing with TTCN-3 Telelogic ...
Managing Concurrency and Parallel Testing with TTCN-3 Telelogic ...
Managing Concurrency and Parallel Testing with TTCN-3 Telelogic ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Connecting <strong>and</strong> mapping• After creation of the components we need to connect portsbetween MTC/PTC components <strong>and</strong> map ports between anMTC/PTC component <strong>and</strong> the Test System Interface – TSI– The mtc-keyword identifies the MTC, system identifies the TSIinstance <strong>and</strong> the self-keyword identifies the currently executingMTC/PTC• Without connecting/mapping a component cannotcommunicate <strong>with</strong> the outside world• When connecting port A <strong>and</strong> port B, the in list of port A mustmatch the out list of port B <strong>and</strong> vice versa• When mapping port A <strong>and</strong> port B, the in list of port A mustmatch the in list of port B, <strong>and</strong> the out list of port A must matchthe out list of port B31© <strong>Telelogic</strong> ABUnconnect <strong>and</strong> Unmap• Connections <strong>and</strong> Mappings can be undone, to changeconfiguration during the runtime of the test• Syntax is the same as for connect <strong>and</strong> map32© <strong>Telelogic</strong> AB