Gulf Coast Waste Disposal in Salt Caverns
Gulf Coast Waste Disposal in Salt Caverns
Gulf Coast Waste Disposal in Salt Caverns
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The last significant factor at the Beaumont site was the surface receiv<strong>in</strong>g facilities fromthe standpo<strong>in</strong>t of whether worthwhile modifications could be made to the design and/or<strong>in</strong>stallation. A review of the <strong>in</strong>itial Moss Bluff receiv<strong>in</strong>g facility <strong>in</strong>dicated areas ofimprovement for efficiency purposes (functionally the orig<strong>in</strong>al design was more thanadequate). These areas of improvement <strong>in</strong>cluded <strong>in</strong>creased ramp area to allow moretrucks to unload simultaneously from three sides <strong>in</strong>stead of one side, a below surfacepump gallery to provide a cont<strong>in</strong>uous submerged suction to the transfer pumps thuselim<strong>in</strong>at<strong>in</strong>g an <strong>in</strong>termediate submersible pump to lift the waste to the transfer pumps,higher volume “gun” l<strong>in</strong>es to provide additional br<strong>in</strong>e to the waste to reduce viscosity andaugment resuspension of solids and reposition<strong>in</strong>g of tanks and other equipment tostreaml<strong>in</strong>e operations.Although the distance of transfer from the receiv<strong>in</strong>g bas<strong>in</strong> to the cavern wellhead at theMoss Bluff facility is 2600 feet and has caused no operational issues, it was felt thatreduc<strong>in</strong>g any transfer distance would be beneficial from a power consumption standpo<strong>in</strong>t.The receiv<strong>in</strong>g bas<strong>in</strong> is anticipated to be with<strong>in</strong> a 100 foot radius of the disposal cavernwellhead when construction is completed. Figure 5 is attached illustrat<strong>in</strong>g the generalsite layout of the surface facilities.