12.07.2015 Views

Metro of Athens

Metro of Athens

Metro of Athens

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONSTRUCTION METHODS& TUNNEL BORING MACHINESFor the construction <strong>of</strong> the underground <strong>Metro</strong> stations and tunnels, up-to-date methods, which ensuredsafe and rapid completion <strong>of</strong> the Project, were applied. The Project construction methods and the TunnelBoring Machines were used either separately, or combined one to another, as deemed applicable, always inrelation with the geological conditions and the in-situ conditions <strong>of</strong> the surrounding area.CONSTRUCTION METHODS• Underground Conventional Boring Method (New Austrian Tunneling Method - NATM)• Cut & Cover Method• Cover & Cut MethodTUNNEL BORING MACHINES• Full Face Cutterhead Tunnel Boring Machines (TBMs)• Earth Pressure Balance, Tunnel Boring Machines (EPB)• Open Face Shield Tunnel Boring Machine (OFS)CONSTRUCTION METHODSConventional Tunnel BoringMethod (NATM)It was used for tunnel boring at soilswith poor mechanical characteristics.This method has been applied in 8stations so far as well as sections <strong>of</strong>single, double and triple track tunnelsas needed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!