12.07.2015 Views

oFFshore Wind Farms - Cowi

oFFshore Wind Farms - Cowi

oFFshore Wind Farms - Cowi

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

offshore <strong>Wind</strong> farm 13Hydrodynamic modelling of waves, current and water levels forms a key part ofthe metocean study. COWI applies the state-of-the-art DHI MIKE hydrodynamicmodelling suite. Wave conditions are modelled by use of MIKE21 SW, typicallyfor durations of 10 to 20 years to allow full statistical analysis of design conditions.Normal and extreme current speed as well as tidal levels and storm surgesare derived from hydrodynamic modelling MIKE21 HD for periods covering a fullyear and selected storm events.Statistical analysis forms the second major part of the metocean study. Thisanalysis includes extreme statistics, scatter tables and joint probability analysisdirectly applicable to the load cases of the IEC-61400-3 standard.COWI applies time and spatially distributed wind and pressure fields as forcing ofthe models. Wave boundary conditions are provided from regional/global wavemodels. Model bathymetry is derived from the global sea chart database MIKEC-MAP combined with site specific surveys. In combination, the global availabilityof such data allows us to perform metocean studies for any site, typicallywithin 3 months from receipt of client-specific data.Scour and scour protectionSeabed/structure interaction in terms of scour, backfilling and scour protectionis presently an area of intense research. COWI maintains very close contact withuniversities and research institutions within this field and contributes to developmentof design approaches. COWI has extensive experience of both deskdesigns of scour protection and planning and supervision of physical modeltests.Selected references››Analysis of metoceanconditions including wind,waves, currents and waterlevels and preparation of thepreliminary design basis forthe gravity based foundationfor the Storgrundet Offshore<strong>Wind</strong> Farm located in Swedishterritorial waters in thesouthern part of the Gulf ofBothnia. For the given sitethree layouts of turbinepositions, comprising 46, 56and 70 wind turbinegenerators located in waterdepths from 10.5 m to 27.5 mare envisaged with 3 MW to 5MW wind turbines››The metocean study for theoffshore wind farm ARCADISOst 1 in Germany includedsalinity, temperature, density,seasonal variations, wind,wave, water level time series,misalignment plots andextreme analysis››Metocean study andpreliminary design basis forSuurhiekka Offshore <strong>Wind</strong>Farm in Finland.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!