- Page 1 and 2:
Spotswood Public SchoolsEnergy Savi
- Page 3:
Section 5: Financial Impact .......
- Page 6 and 7:
Section 2: Project DescriptionThis
- Page 8 and 9:
is used for several programs and ma
- Page 10 and 11:
Schoenly Elementary SchoolThe schoo
- Page 12 and 13:
Utility Baseline AnalysisElectric A
- Page 14 and 15:
Spotswood High SchoolElectric Usage
- Page 16 and 17:
Natural Gas UsageThe monthly consum
- Page 18 and 19:
Baseball FieldMonth Total Gallons W
- Page 20 and 21:
Memorial Middle SchoolElectric Usag
- Page 22 and 23:
Natural Gas UsageA detailed look at
- Page 24 and 25:
The figure below shows the monthly
- Page 26 and 27:
250.0200.0150.0100.050.00.0Appleby
- Page 28 and 29:
The figure below shows the monthly
- Page 30 and 31:
Schoenly Elementary SchoolElectric
- Page 32 and 33:
Natural Gas UsageA detailed look at
- Page 34 and 35:
The figure below shows the monthly
- Page 36 and 37:
Energy Usage SummaryThe table below
- Page 38 and 39:
The graph below uses the energy use
- Page 40 and 41:
The pie chart below shows the distr
- Page 42 and 43:
The National Institute of Standards
- Page 44 and 45:
To calculate the nominal escalation
- Page 46 and 47:
The graph above indicates that the
- Page 48 and 49:
Section 3: Facility Improvement Mea
- Page 50 and 51:
FIM IDFacility Improvement MeasureC
- Page 52 and 53:
FIM IDFacility Improvement MeasureC
- Page 54 and 55:
Boiler Plant MeasuresBoiler Replace
- Page 56 and 57:
• Aerco or equivalent high effici
- Page 58 and 59:
HVAC SystemsRTU ReplacementsFIM Sum
- Page 60 and 61:
Convert RTU from Electric to Gas He
- Page 62 and 63:
Electric Locker Room Unit Ventilato
- Page 64 and 65:
Girls side of the gym and the Boys
- Page 66 and 67:
This measure will replace the rooft
- Page 68 and 69:
Maintenance RequirementsPreventativ
- Page 70 and 71:
this equipment, care should be take
- Page 72 and 73:
Benefits• Energy savings• Impro
- Page 74 and 75:
Building AutomationBuilding Automat
- Page 76 and 77:
Four heating and ventilating (H&V)
- Page 78 and 79:
Robert Shaw thermostat controlling
- Page 80 and 81:
Memorial Middle SchoolOccupied Hour
- Page 82 and 83:
Schoenly Elementary SchoolSchoolYea
- Page 84 and 85:
Admin. VAV Boxes (Typical of 15)Pro
- Page 86 and 87:
Variable Volume Packaged Rooftop Un
- Page 88 and 89:
• Supply fan start/stop/status•
- Page 90 and 91:
Rooftop Unit (Typical of 1)Provide,
- Page 92 and 93:
Lighting System UpgradesParking Lot
- Page 94 and 95:
Scope NarrativeThe exterior fixture
- Page 96 and 97:
Scope of WorkThe following fixtures
- Page 98 and 99:
• Improved interior light quality
- Page 100 and 101:
Facilities Recommended for this Mea
- Page 102 and 103:
Lighting ControlsDaylight Harvestin
- Page 104 and 105:
Scope NarrativeCurrently, approxima
- Page 106 and 107:
Motor MeasuresMotor ReplacementFIM
- Page 108 and 109:
Plug Load SolutionsOffice Plug Load
- Page 110 and 111:
Scope of Work• Furnish and instal
- Page 112 and 113:
Kitchen Equipment and SystemsKitche
- Page 114 and 115:
Scope of Work• Mount and wire the
- Page 116 and 117:
Existing evaporator at high schoolS
- Page 118 and 119:
Electrical SystemsDemand ResponseFI
- Page 120 and 121:
Scope NarrativeThe peak load contri
- Page 122 and 123:
Powersmiths. E-Saver-C3 is a 3-phas
- Page 124 and 125:
Proposed Transformers:kW Losses(Occ
- Page 126 and 127:
Building EnvelopeInfiltration Reduc
- Page 128 and 129:
Door #8 weather seals missing or wo
- Page 130 and 131:
Spotswood High SchoolBuilt in 1976
- Page 132 and 133:
Memorial Middle SchoolMemorial Midd
- Page 134 and 135:
Energy loss at wall intersection Fa
- Page 136 and 137:
In this equation, A crack represent
- Page 138 and 139:
The picture below shows a section o
- Page 140 and 141:
As part of the retrofit, the walls
- Page 142 and 143:
Water System and ControlsElectric H
- Page 144 and 145:
Savings results from the difference
- Page 146 and 147:
Additionally, water from this new w
- Page 148 and 149:
Renewable SolutionsSolar PVFIM Summ
- Page 150 and 151:
Facilities Recommended for this Mea
- Page 152 and 153:
Appleby Elementary School, 145 kW©
- Page 154 and 155:
Savings MethodologyFor purposes of
- Page 156 and 157:
Grants & RebatesGrants - Local, Sta
- Page 158 and 159:
Scope NarrativeThere are several wa
- Page 160 and 161:
Throughout the installation of the
- Page 162 and 163:
Information TechnologiesPC Power Ma
- Page 164 and 165:
School Dude IntegrationFIM SummaryS
- Page 166 and 167:
Facility ManagementFacility Perform
- Page 168 and 169:
• Cooling Capacity: Acceptable pe
- Page 170 and 171: Reporting of the user-selected syst
- Page 172 and 173: Utility Bill MonitoringFIM SummaryA
- Page 174 and 175: Facilities Recommended for this Mea
- Page 176 and 177: Academy of Energy EducationFIM Summ
- Page 178 and 179: Externship, for college undergradua
- Page 180 and 181: Section 4: Measurement and Verifica
- Page 182 and 183: Selecting M&V Options for a Specifi
- Page 184 and 185: ECM DescriptionMeasurement andVerif
- Page 186 and 187: ECM DescriptionMeasurement andVerif
- Page 188 and 189: ECM DescriptionMeasurement andVerif
- Page 190 and 191: ECM DescriptionMeasurement andVerif
- Page 192 and 193: Discussion of ESPE Scope of WorkJoh
- Page 194 and 195: Section 5: Financial ImpactEnergy S
- Page 196 and 197: Parking Lot Lighting - MS $12,000 $
- Page 198 and 199: Operational Savings EstimatesBased
- Page 200 and 201: SRECSFor the purposes of our analys
- Page 202 and 203: Table 4. ESIP - FIM Matrix - Projec
- Page 204 and 205: Transformers - HS Yes Yes YesInfilt
- Page 206 and 207: Option 1© 2011, Johnson ControlsDo
- Page 208 and 209: Option 3© 2011, Johnson ControlsDo
- Page 210 and 211: Option 1© 2011, Johnson ControlsDo
- Page 212 and 213: Option 3© 2011, Johnson ControlsDo
- Page 214 and 215: Section 6: District SupportMaintena
- Page 216 and 217: Section 7: Implementation ScheduleA
- Page 218 and 219: © 2011, Johnson ControlsDo not cop
- Page 222 and 223: Appendix 2: Savings CalculationsWe
- Page 224 and 225: Construction DetailsFacility Compon
- Page 226 and 227: Figure 4: For Appleby Elementary Sc
- Page 228 and 229: Figure 6: Zoning Layout of the Midd
- Page 230 and 231: Figure 10: Appleby Track-side Zonin
- Page 232 and 233: Figure 62: Appleby All-PurposeRoom
- Page 234 and 235: Typical eQUEST HVAC System Schemati
- Page 236 and 237: Typical eQUEST Central Plant Layout
- Page 238 and 239: Air-Side HVAC SchedulesAir-handler
- Page 240 and 241: Memorial Middle SchoolUVs - Origina
- Page 242 and 243: Appleby Elementary SchoolHeat Pumps
- Page 244 and 245: Schoenly Elementary SchoolData from
- Page 246 and 247: desirable to ensure an accurate rep
- Page 248 and 249: The graph below shows the modeled p
- Page 250 and 251: Calibration Results - Memorial Midd
- Page 252 and 253: The graph below shows the modeled e
- Page 254 and 255: Calibration Results - Appleby Eleme
- Page 256 and 257: The graph below shows the modeled e
- Page 258 and 259: The graph below shows the modeled p
- Page 260 and 261: Check Model against Weather Normali
- Page 262 and 263: educed to the system. When the new
- Page 264 and 265: Computer Control Savings SummaryPC
- Page 266 and 267: CPU Active Standby Hibernate OffAve
- Page 268 and 269: Existing Operating ScheduleHoodTurn
- Page 270 and 271:
Proposed Duty Cycle% Rated Speed% R
- Page 272 and 273:
Spotswood High SchoolINSULATEDNON-I
- Page 274 and 275:
Appleby Elementary SchoolINSULATEDN
- Page 276 and 277:
3 E ProgramSystemProcessTempAmbient
- Page 278 and 279:
Building Envelope Savings SummaryDe
- Page 280 and 281:
# of Floors in Building 1Local Shel
- Page 282 and 283:
Solar Savings CalculationsSpotswood
- Page 284 and 285:
© 2011, Johnson ControlsDo not cop
- Page 286 and 287:
© 2011, Johnson ControlsDo not cop
- Page 288 and 289:
Appleby Elementary School© 2011, J
- Page 290 and 291:
© 2011, Johnson ControlsDo not cop
- Page 292 and 293:
© 2011, Johnson ControlsDo not cop
- Page 294 and 295:
© 2011, Johnson ControlsDo not cop
- Page 296 and 297:
© 2011, Johnson ControlsDo not cop
- Page 298 and 299:
© 2011, Johnson ControlsDo not cop
- Page 300 and 301:
© 2011, Johnson ControlsDo not cop
- Page 302 and 303:
Appendix 3: Field MeasurementsWe ha
- Page 304 and 305:
Lighting Power MeasurementsLampout#
- Page 306 and 307:
120High School Lighting Power Compa
- Page 308 and 309:
Motor Power MeasurementsHigh School
- Page 310 and 311:
Appendix 4. Solar PV LayoutsThe Sol
- Page 312 and 313:
Spotswood High School© 2011, Johns
- Page 314 and 315:
Appleby Elementary School© 2011, J