30.11.2012 Views

(AGI) nodes.

(AGI) nodes.

(AGI) nodes.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Using AMI to Realize the<br />

Smart Grid<br />

David G. Hart<br />

July 2008<br />

Copyright © 2008 Elster Integrated Solutions 1


Copyright © 2008 Elster Integrated Solutions<br />

What is AMI?<br />

2


Advanced Meter Infrastructure (AMI)<br />

• Smart meters with two way communications<br />

• Self configuring<br />

• Self healing<br />

• Offer new functionality such as:<br />

• Interval data<br />

• TOU data<br />

• Home automation<br />

• Service connect/disconnect<br />

Copyright © 2008 Elster Integrated Solutions<br />

3


AMI Network<br />

Steps<br />

1. Collector looks for<br />

unregistered <strong>nodes</strong><br />

2. Collector registers level 1<br />

<strong>nodes</strong><br />

Copyright © 2008 Elster Integrated Solutions<br />

Each path is qualified !<br />

A3 Meter with WAN<br />

interface is the Collector<br />

Collector<br />

Level 1<br />

A3 Meter or REX<br />

Meter acts as a node<br />

in the Mesh<br />

Network<br />

4


AMI Network<br />

Steps<br />

1. Collector looks for<br />

unregistered <strong>nodes</strong><br />

2. Collector registers level 1<br />

<strong>nodes</strong><br />

3. Collector interrogates level<br />

1 <strong>nodes</strong> to find level 2<br />

<strong>nodes</strong><br />

Copyright © 2008 Elster Integrated Solutions<br />

Collector<br />

Level 1<br />

Level 2<br />

5


AMI Network<br />

Steps<br />

1. Collector looks for<br />

unregistered <strong>nodes</strong><br />

2. Collector registers level 1<br />

<strong>nodes</strong><br />

3. Collector interrogates level<br />

1 <strong>nodes</strong> to find level 2<br />

<strong>nodes</strong><br />

4. Collector interrogates level<br />

2 <strong>nodes</strong> to find level 3<br />

<strong>nodes</strong><br />

5. Collector builds out entire<br />

network<br />

Copyright © 2008 Elster Integrated Solutions<br />

Collector<br />

<strong>AGI</strong><br />

Level 1<br />

Level 2<br />

DR<br />

Level 3 …..<br />

Gas<br />

Water<br />

6


AMI Network<br />

MAS Server<br />

Collector<br />

Level 1<br />

Level 2<br />

Level 3 …..<br />

Copyright © 2008 Elster Integrated Solutions<br />

Collector<br />

Level 1<br />

Level 2<br />

Level 3 …..<br />

WAN<br />

Billing, OMS, CIS, Load Research<br />

Collector<br />

Level 1<br />

Level 2<br />

Level 3 …..<br />

7


Meter Functionality<br />

Meter calculates:<br />

• kWh-delivered<br />

• kWh-received<br />

• kWh-delivered+received<br />

• kWh-delivered-received (not<br />

available as a demand source)<br />

• Alternate energy sources (VARh<br />

and VAh available Q4 ’08).<br />

Firmware will be upgradeable<br />

remotely<br />

• Interval data<br />

• Demand data<br />

Copyright © 2008 Elster Integrated Solutions<br />

kWh<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

15 Minute Load Profile Data (kWh)<br />

2:15:00<br />

2:30:00<br />

2:45:00<br />

3:00:00<br />

3:15:00<br />

3:30:00<br />

3:45:00<br />

4:00:00<br />

4:15:00<br />

4:30:00<br />

4:45:00<br />

5:00:00<br />

5:15:00<br />

5:30:00<br />

5:45:00<br />

6:00:00<br />

6:15:00<br />

6:30:00<br />

6:45:00<br />

7:00:00<br />

7:15:00<br />

7:30:00<br />

7:45:00<br />

8:00:00<br />

Meter Data<br />

Tier A kWh 1949<br />

Tier B kWh 748<br />

Tier C kWh 7319<br />

Tier D kWh 718<br />

Tier E kWh<br />

Total Received<br />

767<br />

kWh 0<br />

Total kWh 11501<br />

Max Demand 1 2.37<br />

Max Demand 2 2.37<br />

Voltage 242.43<br />

Time<br />

8


AMI - Architecture Overview<br />

LAN / WAN<br />

Main MAS Server<br />

HP DL580<br />

Fibre Channel / SCSI<br />

MAS (Meter Automation Server)<br />

REX Meter<br />

with 900<br />

MHz LAN<br />

Copyright © 2008 Elster Integrated Solutions<br />

Asset Mgmt WMS CIS / Billing OMS Load<br />

Research<br />

Enterprise<br />

MDM<br />

Systems<br />

Backup MAS Server<br />

HP StorageWorks MSA1000<br />

REX Meter<br />

with 900<br />

MHz LAN<br />

HP DL580<br />

Elster Gas Modules<br />

With 900 MHz LAN<br />

Shared Storage Interconnect<br />

LAN<br />

A3 ALPHA<br />

Meter/Collector<br />

Optional<br />

Tape Library<br />

Level 1<br />

Level 2<br />

Level 3<br />

Level 8<br />

DMZ<br />

HP DL380<br />

Corporate Firewall<br />

Remote Comm Server 1<br />

HP DL380<br />

Remote Comm Server 4<br />

Outgoing WAN Connections<br />

9


Copyright © 2008 Elster Integrated Solutions<br />

What is the Smart<br />

Grid?<br />

10


Elster is a member of EPRI’s IntelliGrid Program<br />

Supporting the Power Delivery System of the Future<br />

Uses open standards-based architecture<br />

Integrates data communications networks and intelligent equipment<br />

Provides the methods, tools, best practices and recommendations for specifying<br />

“intelligent” systems to promote:<br />

• Interoperability<br />

• Flexibility<br />

• Expandability<br />

• Effective security for data and system management<br />

Copyright © 2008 Elster Integrated Solutions<br />

Content provided by EPRI, the IntelliGrid Program<br />

11


Vision of Smart Grid<br />

• Self healing distribution power grid<br />

• Grid free of disturbances such as sags, swells,<br />

interruptions<br />

• Secure operation<br />

• Accommodates a wide variety of generation<br />

options<br />

• Optimizes Asset Utilization and O&M<br />

expenses<br />

Copyright © 2008 Elster Integrated Solutions<br />

12


Copyright © 2008 Elster Integrated Solutions<br />

How does AMI help<br />

realize the smart<br />

grid?<br />

13


Elster’s View of the AMI and the Smart Grid<br />

• There is no single definition of Smart Grid<br />

• Many define Smart Grid from 50,000 feet<br />

• AMI is a key part of the Smart Grid but not the only<br />

part<br />

• Start by leveraging AMI infrastructure<br />

• AMI vendors need to partner with utilities and key<br />

technology partners to realize components of the<br />

smart grid<br />

Copyright © 2008 Elster Integrated Solutions<br />

Smart Grid AMI = <strong>AGI</strong><br />

14


AMI Allows for more economical remote<br />

sensing<br />

Number of Points<br />

Copyright © 2008 Elster Integrated Solutions<br />

AMI<br />

Distribution<br />

Cost of Communications<br />

AMI Meters and <strong>AGI</strong> Nodes<br />

<strong>AGI</strong> <strong>nodes</strong> allow measurements<br />

across the grid<br />

Transmission<br />

Generation<br />

15


Power Grid Today<br />

Power Goes In<br />

Copyright © 2008 Elster Integrated Solutions<br />

DMS<br />

Power Goes Out<br />

16


Smart Grid Tomorrow<br />

Copyright © 2008 Elster Integrated Solutions<br />

DMS Billing O&MPlanning Customer<br />

Service<br />

26<br />

24<br />

22<br />

20<br />

18<br />

16<br />

14<br />

12<br />

10<br />

Residential Load Curve<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

Time of Day<br />

17


• We should not think of AMI endpoints as<br />

traditional revenue meters but as Advanced<br />

Grid Infrastructure (<strong>AGI</strong>) <strong>nodes</strong>.<br />

Today an AMI device or endpoint looks like:<br />

Tomorrow AMI endpoints will also look like:<br />

Copyright © 2008 Elster Integrated Solutions<br />

18


<strong>AGI</strong> Endpoints<br />

MV Overhead Line<br />

Sensor Node<br />

Copyright © 2008 Elster Integrated Solutions<br />

LV Distribution<br />

Transformer Node<br />

MV Underground Line<br />

Node<br />

Thermostat<br />

MV Recloser Node<br />

19


<strong>AGI</strong> – the Benefits<br />

Customer<br />

Service<br />

• Outage<br />

Management System<br />

– use smart meters to<br />

report outages<br />

• Power Quality – use<br />

smart meter voltage<br />

reporting to better<br />

understand voltage<br />

profile across system<br />

•Customer Usage –<br />

use smart controls to<br />

level loads and inform<br />

customer of usage<br />

(IHD)<br />

Copyright © 2008 Elster Integrated Solutions<br />

Operations<br />

• Efficiency – central<br />

Volt/Var control<br />

• Maintenance – Use<br />

outage indices to<br />

target areas needing<br />

maintenance<br />

• Reduce Losses –<br />

Tamper detection<br />

• Reduce Losses –<br />

Non-technical loss<br />

detection<br />

• Load Flow –<br />

improved data for load<br />

modeling for<br />

renewables or switch<br />

reconfiguration -<br />

Planning<br />

• Loading – use<br />

historical data to obtain<br />

better information on<br />

transformer/feeder<br />

loading<br />

20


Copyright © 2008 Elster Integrated Solutions<br />

Some Examples<br />

21


Pilot for Loss Detection<br />

• Joint utility/Elster/ABB pilot to demonstrate loss<br />

detection<br />

• ABB FeederAll allows user to model electrical<br />

network<br />

• Head and load meters are modeled in the<br />

network<br />

• Elster meter data is imported from files<br />

• User initiated trace shows the loads and circuit<br />

covered by a head meter<br />

• Dynamic trace detects head meters<br />

downstream from an upstream head meter<br />

• Downstream head meter reading is subtracted<br />

• Difference indicates losses<br />

Copyright © 2008 Elster Integrated Solutions<br />

22


Thermostats with Load Control<br />

• Deployed in the field<br />

• Expands the basic Energate thermostat to<br />

provide:<br />

• event status information<br />

• energy use information<br />

Copyright © 2008 Elster Integrated Solutions<br />

23


Conclusions<br />

• AMI will become a key part of the smart grid<br />

• AMI has the potential to provide significant missing measurements in distribution<br />

power system applications, providing solutions matching real-time conditions<br />

throughout the distribution network<br />

• AMI provides the capability to:<br />

• verify and improve real-time per phase unbalanced load flow<br />

• outage and restoration notification<br />

• Understand load flows on the distribution grid<br />

• Improve planning<br />

• Improve maintenance<br />

• Inform customers of usage<br />

• Initiate load conservation<br />

• If you believe the future requires more energy generation, better control and<br />

conservation are also required<br />

Copyright © 2008 Elster Integrated Solutions<br />

24


Thank You !<br />

Copyright © 2008 Elster Integrated Solutions 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!