application for authority to construct and permit to operate
application for authority to construct and permit to operate
application for authority to construct and permit to operate
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3433 Rober<strong>to</strong> Court, San Luis Obispo, CA 93401Phone: (805) 781-5912 FAX: (805) 781-1002Email: info@slocleanair.orgWeb Site: www.slocleanair.orgWINE OPERATION PERMIT APPLICATION FORM (continued)7. Stationary Engines 50 Hp <strong>and</strong> Larger (If applicable)(For multiple engines that are not identical, attach the following in<strong>for</strong>mation <strong>for</strong> each engine.)Manufacturer: Model: Serial No:Engine Size bhp @ rpm Year of Mfg. Year of installationNumber identical enginesEPA certification No., if known:Genera<strong>to</strong>r Mfg: Model: Rating: kWType of Use:direct-drivefire pump backup genera<strong>to</strong>r Other (specify)8. Hot Water Heater And Boiler Data For Units Rated At 500,000 Btus/Hr <strong>and</strong> Larger(For multiple boilers that are not identical, attach the following in<strong>for</strong>mation <strong>for</strong> each boiler)Boiler Manufacturer: Model: Serial No:Burner Manufacturer Model: Serial No:Heat Input Rating (mmBtu/hr) Fuel type Year of Mfg. Year of InstallationNumber of Identical Boilers9. His<strong>to</strong>rical S<strong>to</strong>rage <strong>and</strong> Fermentation DataYear:White Wine Fermentation(gallons)Red Wine Fermentation(gallons)Peak wine volume s<strong>to</strong>red in Barrels at anytime during the year (gallons)20052006200710. Tank Data attached Yes (note <strong>for</strong>m is required)I hereby certify that all in<strong>for</strong>mation provided on this <strong>application</strong>, <strong>and</strong> its plans, attachments, <strong>and</strong> supplemental <strong>for</strong>ms, istrue <strong>and</strong> correct. I agree <strong>to</strong> pay any <strong>and</strong> all fees required by District rules <strong>for</strong> processing this <strong>application</strong> <strong>and</strong> <strong>for</strong>issuance of any Authority <strong>to</strong> Construct or Permit <strong>to</strong> Operate. If I ab<strong>and</strong>on this project <strong>and</strong> withdraw my <strong>application</strong>, orshould my <strong>application</strong> be disapproved, I agree that the obligation exists <strong>to</strong> compensate the District <strong>for</strong> time spentprocessing my <strong>application</strong>.11 SIGNATURE: 12. DATE:13. PRINT NAME:14. ORGANIZATION:H:\ENGINEER\FORMS\On-Line\GeneralForms\Winery_App_2011.doc Page 2 of 4 August 2011