12.07.2015 Views

Download Brochure. - Rezayat Commercial

Download Brochure. - Rezayat Commercial

Download Brochure. - Rezayat Commercial

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TechnotePage 7 of 8Introduction1Figure 2.6 Water distribution system, static balancingFigure 2.7 Water distribution system, dynamic balancingIn the static system each terminal has to be balanced in9 groups of 3 terminals each. Hereafter the 9 terminalsections have to be balanced in 3 groups of 3 distributinglines each. After that the 3 main distributing lines have tobe balanced. And finally the distributing line is adjusted toensure the total design flow.This balancing procedure requires one balancing valve perterminal, one balancing valve per distributing line, one balancingvalve per main distributing line and one balancingvalve in the supply line.In the dynamic system the individual terminals can be adjustedindependently of each other. This simply requires onebalancing valve per terminal.UK Intro AUG 11www.frese.eu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!