12.07.2015 Views

Grange Resources Limited, Level 13, 221 St Georges Terrace, Perth ...

Grange Resources Limited, Level 13, 221 St Georges Terrace, Perth ...

Grange Resources Limited, Level 13, 221 St Georges Terrace, Perth ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Southdown Magnetite ProjectDEVELOPMENT PLANMINING AND CONCENTRATIONProduction of 6.6 Mtpa of Magnetite Concentrate at 69%FeTRANSPORT AND SHIPLOADINGConcentrates transported by slurry pipeline to Port of Albany(90kms), dewatered, stockpiled and loaded onto Capesizevessels for transport to Southeast Asia.PELLETIZATIONConcentrates to be made into Direct Reduction (DR) andBlast Furnace (BF) pellets at a new plant to be constructed inSoutheast Asia.MARKETSPellets to be sold to Direct Reduction market (Malaysia,Indonesia, Middle East) and to steel producers in China,Japan, South Korea and Taiwan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!