ECS/H+PS, 13 september 2010
Good evening<br />
We will discuss today<br />
•Progress on the new school project to date<br />
•Where we are in the process<br />
•What will happen from now<br />
Contents
Perceived need<br />
<strong>The</strong> perceived condition of the school called for<br />
consideration of:<br />
•the condition of the school<br />
•projected school roll<br />
•broader needs of the community<br />
Progress to date….
Liaison with the school<br />
Stakeholder sessions have resulted in:<br />
•Teacher, pupil, and parent group participation<br />
•Generating an outline brief<br />
•Working with an architect to generate feasibilty studies, and<br />
•Technical assessments<br />
•Establishment of probable construction Costs, and<br />
•Examination of whole life costs<br />
Please refer to the Options Cost Analyses prepared by<br />
Caledonian Economics.<br />
Progress to date….
Feasibility, option 1<br />
Refurbishment and extension of the existing<br />
school<br />
Pros Cons<br />
Embedded value Longer construction timeframe<br />
Emotional attachment Disruptive phasing<br />
Less expensive Solution would never be ideal<br />
Cramped site, no future expansion<br />
<strong>High</strong> maintenance costs<br />
Progress to date….
Feasibility, option 1<br />
Progress to date….
Feasibility, option 2<br />
New build school on the existing site<br />
Pros Cons<br />
Fit for purpose facility Limited land available<br />
All weather pitch retained Playing fields lost during build<br />
Access issues<br />
Limited space for expansion<br />
Progress to date….
Feasibility, option 2<br />
Progress to date….
Feasibility, option 3<br />
New school on Bignold Park, with pool, library, and performing<br />
arts venue:<br />
Pros Cons<br />
Fit for purpose facility Land ownership issues<br />
Large open site would allow Longer consultation process<br />
future expansion Site unknowns<br />
Creation of a well located<br />
community hub<br />
No school disruption during<br />
build<br />
Progress to date….
Feasibility, option 3<br />
Progress to date….
Feasibility, option 4<br />
New build school on the existing site with pool, library, and<br />
performing arts venue:<br />
Pros Cons<br />
Fit for purpose facility Limited land available<br />
Creation of a community Playing fields lost during build<br />
hub Access issues<br />
Remote parking for staff<br />
Limits on future expansion<br />
Progress to date….
Feasibility, option 4<br />
Progress to date….
Feasibility, review of findings<br />
Progress to date….<br />
cost programme remarks<br />
Option 1 £29.5m 60+ months Rejected by community,<br />
decision validated by<br />
committee<br />
Option 2 £31.8 42 months Overtaken by events,<br />
embedded in option 4,<br />
therefore dropped.<br />
Option 3 £34.9m 42 months Committee instruction to<br />
progress option<br />
Option 4 £33.8m 42 months Committee instruction to<br />
progress option
Funding<br />
Funding streams pledged to date, based on options 3 and 4:<br />
SFT £18.4m<br />
<strong>High</strong>land <strong>Council</strong> £15.8m<br />
Total £34.2m<br />
Scottish Futures Trust is the Government’s funding vehicle for<br />
public works.<br />
<strong>The</strong>re may be opportunity for the community to have<br />
additional facilities if funding can be secured.<br />
Progress to date….
Summary<br />
What has been achieved to date?<br />
•We have worked with the stakeholder group<br />
•We have established an outline brief for the school<br />
•We have tested the available sites for suitability, and<br />
•We have narrowed focus to two options<br />
•We have worked to secure funding for a school with<br />
significant community facilities<br />
We are now ready for the next stage in the process.<br />
Where we are now….
Programme<br />
Feasibility<br />
Statutory<br />
<strong>Consultation</strong><br />
Stakeholder<br />
<strong>Consultation</strong><br />
Design<br />
Tender and<br />
build now<br />
What happens now…<br />
SFT funding<br />
2010 2011 2012 2013 2014
Statutory consultation<br />
By law we are required to undertake a statutory consultation<br />
to determine:<br />
•Site selection<br />
•Project content<br />
What happens now…
Statutory consultation<br />
<strong>High</strong> <strong>School</strong><br />
What happens now…<br />
Bignold Park
Statutory consultation<br />
<strong>Wick</strong><br />
<strong>High</strong> <strong>School</strong> Bignold<br />
Park<br />
What happens now…
Project content<br />
<strong>School</strong><br />
•<strong>High</strong> school facilities for 840 pupils<br />
And, suggested community facilities:<br />
•25 metre, 6 lane swimming pool<br />
•Library<br />
•250 seat performance venue<br />
•Other??<br />
This is a significant moment for the community.<br />
What happens now…
Project content<br />
What happens now…<br />
???
Brief development<br />
Architecture and Design Scotland<br />
•HC is in dialogue with Sam Cassells, education advisor with<br />
A+DS on current thinking about brief development<br />
•Sam could not attend this evening, and sends his apologies<br />
A+DS encourage collaboration and participation<br />
•Collaboration with other agencies to explore best value from<br />
the public purse<br />
•Participation with stakeholders to determine appropriate and<br />
sustainable solutions<br />
What happens now…
Brief development<br />
Curriculum for excellence<br />
•What does this mean for school design<br />
•How will education be delivered, now and in the future<br />
•Designing with flexibility in mind<br />
Appointment of an education advisor<br />
•To assist us to tease out the most appropriate brief, to<br />
•Maximise the potential of the new school, and<br />
•Ensure the brief is tailored for the needs of <strong>Wick</strong><br />
What happens now…
Brief development<br />
What happens now…<br />
Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh
Brief development<br />
What happens now…<br />
Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh
Brief development<br />
What happens now…<br />
Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh
Design development<br />
Challenges<br />
•Maximise educational and community benefits<br />
•Ensure best value for the public purse<br />
•Satisfy the needs of the various stakeholders<br />
•Allow delivery of the curriculum and allow flexibility in the<br />
future<br />
•Take account of recent development in education design<br />
•Sustainability<br />
•Provide a beacon in the community<br />
What happens now…
Design development<br />
What happens now…
Design development<br />
What happens now…
Design development<br />
Milton of Leys PS
Design development<br />
Conon Bridge PS
Summary<br />
We are at the beginning of the next stage in the journey.<br />
We are looking forward to working with the community to<br />
achieve the best possible outcome.<br />
<strong>The</strong> statutory consultation on the two sites and the project<br />
content follows….<br />
Thank you…
<strong>High</strong> <strong>School</strong><br />
<strong>Wick</strong><br />
Bignold Park
<strong>Wick</strong><br />
<strong>High</strong> <strong>School</strong> Bignold<br />
Park<br />
<strong>Wick</strong>, <strong>School</strong> site options
<strong>Wick</strong>, Existing <strong>High</strong> <strong>School</strong> site
<strong>Wick</strong>, Bignold Park
Statutory consultation<br />
What are your views on the two sites?<br />
What facilities could be included in the project?<br />
New <strong>High</strong> <strong>School</strong>, <strong>Wick</strong>