<strong>Wick</strong> <strong>High</strong> <strong>School</strong><br />

<strong>Wick</strong> <strong>High</strong> <strong>School</strong><br />

ECS/H+PS, 13 september 2010


Good evening<br />

We will discuss today<br />

•Progress on the new school project to date<br />

•Where we are in the process<br />

•What will happen from now<br />

Contents


Perceived need<br />

<strong>The</strong> perceived condition of the school called for<br />

consideration of:<br />

•the condition of the school<br />

•projected school roll<br />

•broader needs of the community<br />

Progress to date….


Liaison with the school<br />

Stakeholder sessions have resulted in:<br />

•Teacher, pupil, and parent group participation<br />

•Generating an outline brief<br />

•Working with an architect to generate feasibilty studies, and<br />

•Technical assessments<br />

•Establishment of probable construction Costs, and<br />

•Examination of whole life costs<br />

Please refer to the Options Cost Analyses prepared by<br />

Caledonian Economics.<br />

Progress to date….


Feasibility, option 1<br />

Refurbishment and extension of the existing<br />

school<br />

Pros Cons<br />

Embedded value Longer construction timeframe<br />

Emotional attachment Disruptive phasing<br />

Less expensive Solution would never be ideal<br />

Cramped site, no future expansion<br />

<strong>High</strong> maintenance costs<br />

Progress to date….


Feasibility, option 1<br />

Progress to date….


Feasibility, option 2<br />

New build school on the existing site<br />

Pros Cons<br />

Fit for purpose facility Limited land available<br />

All weather pitch retained Playing fields lost during build<br />

Access issues<br />

Limited space for expansion<br />

Progress to date….


Feasibility, option 2<br />

Progress to date….


Feasibility, option 3<br />

New school on Bignold Park, with pool, library, and performing<br />

arts venue:<br />

Pros Cons<br />

Fit for purpose facility Land ownership issues<br />

Large open site would allow Longer consultation process<br />

future expansion Site unknowns<br />

Creation of a well located<br />

community hub<br />

No school disruption during<br />

build<br />

Progress to date….


Feasibility, option 3<br />

Progress to date….


Feasibility, option 4<br />

New build school on the existing site with pool, library, and<br />

performing arts venue:<br />

Pros Cons<br />

Fit for purpose facility Limited land available<br />

Creation of a community Playing fields lost during build<br />

hub Access issues<br />

Remote parking for staff<br />

Limits on future expansion<br />

Progress to date….


Feasibility, option 4<br />

Progress to date….


Feasibility, review of findings<br />

Progress to date….<br />

cost programme remarks<br />

Option 1 £29.5m 60+ months Rejected by community,<br />

decision validated by<br />

committee<br />

Option 2 £31.8 42 months Overtaken by events,<br />

embedded in option 4,<br />

therefore dropped.<br />

Option 3 £34.9m 42 months Committee instruction to<br />

progress option<br />

Option 4 £33.8m 42 months Committee instruction to<br />

progress option


Funding<br />

Funding streams pledged to date, based on options 3 and 4:<br />

SFT £18.4m<br />

<strong>High</strong>land <strong>Council</strong> £15.8m<br />

Total £34.2m<br />

Scottish Futures Trust is the Government’s funding vehicle for<br />

public works.<br />

<strong>The</strong>re may be opportunity for the community to have<br />

additional facilities if funding can be secured.<br />

Progress to date….


Summary<br />

What has been achieved to date?<br />

•We have worked with the stakeholder group<br />

•We have established an outline brief for the school<br />

•We have tested the available sites for suitability, and<br />

•We have narrowed focus to two options<br />

•We have worked to secure funding for a school with<br />

significant community facilities<br />

We are now ready for the next stage in the process.<br />

Where we are now….


Programme<br />

Feasibility<br />

Statutory<br />

<strong>Consultation</strong><br />

Stakeholder<br />

<strong>Consultation</strong><br />

Design<br />

Tender and<br />

build now<br />

What happens now…<br />

SFT funding<br />

2010 2011 2012 2013 2014


Statutory consultation<br />

By law we are required to undertake a statutory consultation<br />

to determine:<br />

•Site selection<br />

•Project content<br />

What happens now…


Statutory consultation<br />

<strong>High</strong> <strong>School</strong><br />

What happens now…<br />

Bignold Park


Statutory consultation<br />

<strong>Wick</strong><br />

<strong>High</strong> <strong>School</strong> Bignold<br />

Park<br />

What happens now…


Project content<br />

<strong>School</strong><br />

•<strong>High</strong> school facilities for 840 pupils<br />

And, suggested community facilities:<br />

•25 metre, 6 lane swimming pool<br />

•Library<br />

•250 seat performance venue<br />

•Other??<br />

This is a significant moment for the community.<br />

What happens now…


Project content<br />

What happens now…<br />

???


Brief development<br />

Architecture and Design Scotland<br />

•HC is in dialogue with Sam Cassells, education advisor with<br />

A+DS on current thinking about brief development<br />

•Sam could not attend this evening, and sends his apologies<br />

A+DS encourage collaboration and participation<br />

•Collaboration with other agencies to explore best value from<br />

the public purse<br />

•Participation with stakeholders to determine appropriate and<br />

sustainable solutions<br />

What happens now…


Brief development<br />

Curriculum for excellence<br />

•What does this mean for school design<br />

•How will education be delivered, now and in the future<br />

•Designing with flexibility in mind<br />

Appointment of an education advisor<br />

•To assist us to tease out the most appropriate brief, to<br />

•Maximise the potential of the new school, and<br />

•Ensure the brief is tailored for the needs of <strong>Wick</strong><br />

What happens now…


Brief development<br />

What happens now…<br />

Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh


Brief development<br />

What happens now…<br />

Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh


Brief development<br />

What happens now…<br />

Thanks to City of Edinburgh/Barry Best for the images from James Gillespie <strong>High</strong> <strong>School</strong>, Edinburgh


Design development<br />

Challenges<br />

•Maximise educational and community benefits<br />

•Ensure best value for the public purse<br />

•Satisfy the needs of the various stakeholders<br />

•Allow delivery of the curriculum and allow flexibility in the<br />

future<br />

•Take account of recent development in education design<br />

•Sustainability<br />

•Provide a beacon in the community<br />

What happens now…


Design development<br />

What happens now…


Design development<br />

What happens now…


Design development<br />

Milton of Leys PS


Design development<br />

Conon Bridge PS


Summary<br />

We are at the beginning of the next stage in the journey.<br />

We are looking forward to working with the community to<br />

achieve the best possible outcome.<br />

<strong>The</strong> statutory consultation on the two sites and the project<br />

content follows….<br />

Thank you…


<strong>High</strong> <strong>School</strong><br />

<strong>Wick</strong><br />

Bignold Park


<strong>Wick</strong><br />

<strong>High</strong> <strong>School</strong> Bignold<br />

Park<br />

<strong>Wick</strong>, <strong>School</strong> site options


<strong>Wick</strong>, Existing <strong>High</strong> <strong>School</strong> site


<strong>Wick</strong>, Bignold Park


Statutory consultation<br />

What are your views on the two sites?<br />

What facilities could be included in the project?<br />

New <strong>High</strong> <strong>School</strong>, <strong>Wick</strong>