- Page 4 and 5: Volume -IConditions of ContractCont
- Page 8 and 9: SECTION-IIINSTRUCTION TO BIDDERS (I
- Page 10 and 11: Volume -III: Bid Form, Price Schedu
- Page 12 and 13: (c)Attachment 3 : Bidder's Eligibil
- Page 14 and 15: the bidding documents are intended
- Page 16 and 17: 10.3 Bidders shall give a breakdown
- Page 18 and 19: 11.0 Bid Currencies11.1 Prices shal
- Page 20 and 21: D. Submission of Bids15.0 Sealing a
- Page 22 and 23: 18.4 No bid may be withdrawn in the
- Page 24 and 25: (i) Appendix 2 to the Form of Contr
- Page 26 and 27: (vi)(vii)Cost of Withdrawal of Devi
- Page 28 and 29: idder offering deliveries/ completi
- Page 30 and 31: delivery at Site, unloading storage
- Page 32 and 33: Annexure-A (ITB)Qualification of th
- Page 34 and 35: satisfactory operation for at least
- Page 36 and 37: PART-Bof last five financial years
- Page 38 and 39: a) are commercially oriented legal
- Page 40 and 41: PV FORMULA FOR CABLEANNEXURE-BEC=EC
- Page 42 and 43: ANNEXURE-CChecklist (To be filled b
- Page 44 and 45: 5. PQ Test:(a)i)Rated voltage:ii)Co
- Page 46 and 47: Annexure-D1CONSENT LETTER FROM CABL
- Page 48 and 49: Annexure-D2CONSENT LETTER FROM CABL
- Page 50 and 51: CONTENTSFORCONDITIONS OF CONTRACT(S
- Page 52 and 53:
Section IIIConditions of Contract (
- Page 54 and 55:
Time for completionS.No.Activities1
- Page 56 and 57:
3.6 Entire AgreementSubject to CC S
- Page 58 and 59:
out of the Works either party shall
- Page 60 and 61:
7.5 In the event of termination of
- Page 62 and 63:
10.5 Unless otherwise specified in
- Page 64 and 65:
13.3.3 Reduction in the security pr
- Page 66 and 67:
source as per the rules and issue T
- Page 68 and 69:
The Contractor shall not revoke the
- Page 70 and 71:
otherwise be agreed upon between th
- Page 72 and 73:
to proceed. The Contractor shall pr
- Page 74 and 75:
Contractor shall mail the following
- Page 76 and 77:
maintenance of all such persons fro
- Page 78 and 79:
h) Equal Remuneration Act 1979: The
- Page 80 and 81:
The Public Liability Insurance Act,
- Page 82 and 83:
23.3 Whenever the Contractor is rea
- Page 84 and 85:
notice under CC Sub-Clause 24.4, ei
- Page 86 and 87:
mentioned in Sub-Clause CC 25.2.3.3
- Page 88 and 89:
the work executed by the Contractor
- Page 90 and 91:
and recover the payments already ma
- Page 92 and 93:
30. Limitation of Liability30.1 Exc
- Page 94 and 95:
32.4 With respect to any loss or da
- Page 96 and 97:
34.3 The Contractor shall, in accor
- Page 98 and 99:
e deemed to include any change in i
- Page 100 and 101:
If the Employer does not require th
- Page 102 and 103:
objection, the employer and the con
- Page 104 and 105:
40. Extension of Time for Completio
- Page 106 and 107:
42.1 Termination for Employer's Con
- Page 108 and 109:
or to take steps to remedy the same
- Page 110 and 111:
42.3.3 If the Contract is terminate
- Page 112 and 113:
contract with the employer or if th
- Page 114 and 115:
CONTENTSFORMS AND PROCEDURESSECTION
- Page 116 and 117:
2. BID SECURITY FORMDate: ....…
- Page 118 and 119:
3a. FORM OF NOTIFICATION BY THE EMP
- Page 120 and 121:
4a. FORM OF NOTIFICATION OF AWARD O
- Page 122 and 123:
Project)………........... as per
- Page 124 and 125:
4b. FORM OF 'NOTIFICATION OF AWARD
- Page 126 and 127:
of your responsibility/obligations
- Page 128 and 129:
(5) The Bid and Price Schedules sub
- Page 130 and 131:
Article 5.Article 6.AppendicesThe A
- Page 132 and 133:
TERMS AND PROCEDURES OF PAYMENTAPPE
- Page 134 and 135:
In case, the Contractor opts for th
- Page 136 and 137:
APPENDIX 2PRICE ADJUSTMENTRefer to
- Page 138 and 139:
the Facilities.Amount Deductible li
- Page 140 and 141:
APPENDIX 4TIME SCHEDULE1. The Proje
- Page 142 and 143:
SCOPE OF WORKS AND SUPPLY BY THE EM
- Page 144 and 145:
FUNCTIONAL GUARANTEESAPPENDIX - 8GU
- Page 146 and 147:
All notice to be given under shall
- Page 148 and 149:
This letter of Guarantee shall be v
- Page 150 and 151:
7. BANK GUARANTEE FORM FOR ADVANCE
- Page 152 and 153:
8. FORM OF COMPLETION CERTIFICATEDa
- Page 154 and 155:
10. CHANGE ORDER PROCEDUREContract
- Page 156 and 157:
REQUEST FOR CHANGE PROPOSAL[ANNEXUR
- Page 158 and 159:
ESTIMATE FOR CHANGE PROPOSAL[ANNEXU
- Page 160 and 161:
[ANNEXURE 3]ACCEPTACE OF ESTIMATES
- Page 162 and 163:
7. Reference drawings and/ or techn
- Page 164 and 165:
[ANNEXURE 5]CHANGE ORDER………
- Page 166 and 167:
APPLICATION FOR CHANGE PROPOSAL…
- Page 168 and 169:
[ANNEXURE 8]CHANGE ORDER LOG……
- Page 170 and 171:
3. The contractor undertakes that t
- Page 172 and 173:
12. FORM OF INDEMNITY BOND To BE EX
- Page 174 and 175:
SCHEDULE No. 1Particulars of Quanti
- Page 176 and 177:
14. FORM OF TRUST RECEIPT FOR PLANT
- Page 178 and 179:
16. FORM OF POWER OF ATTORNEY FOR J
- Page 180 and 181:
17. FORM OF JOINT VENTURE AGREEMENT
- Page 182 and 183:
contract performance security from
- Page 184 and 185:
and successful performance of the c
- Page 186 and 187:
DELHI TRANSCO LIMITED(A Government
- Page 188 and 189:
VOLUME IITECHNICAL SPECIFICATIONS O
- Page 190 and 191:
SECTION I -CONTENTSGENERAL INFORMAT
- Page 192 and 193:
2.5 The specification also covers t
- Page 194 and 195:
IEE635-1989(R 1994) Guide for selec
- Page 196 and 197:
SECTION-IICable System Specificatio
- Page 198 and 199:
SECTION-IICABLE SYSTEM SPECIFICATIO
- Page 200 and 201:
The cable size shall be suitable to
- Page 202 and 203:
CONTENTSECTION III - SCHEDULE OF TE
- Page 204 and 205:
1.5.0 TYPE TEST(s)The electrical te
- Page 206 and 207:
CONTENTSECTION IVLAYING, JOINTING A
- Page 208 and 209:
(iii)a) Unloading and loading of th
- Page 210 and 211:
SECTION-VFiber optical Cable1.0 Use
- Page 212 and 213:
CONTENTSECTION VI - QUALITY ASSURAN
- Page 214 and 215:
All material used for equipment man
- Page 217 and 218:
BLACK FILLING CONSISTING OF PREVIOU
- Page 219 and 220:
BLACK FILLING CONSISTING OF PREVIOU
- Page 221 and 222:
SECTION-VIIISCHEDULE OF GUARANTEED
- Page 223 and 224:
42. Cable coversa) Dimensionb) Desi
- Page 225 and 226:
Bidding DocumentsForTurnkey Package
- Page 227 and 228:
SECTION - IBID FORMS
- Page 229 and 230:
Or such other sums as may be determ
- Page 231 and 232:
3.4 We understand that in the price
- Page 233 and 234:
each clause. In such an event, the
- Page 235 and 236:
(State or Province to be indicated)
- Page 237 and 238:
CONTENTSFORATTACHMENTSAttachment 1A
- Page 239 and 240:
(e)(f)(g)(h)(i)contract shall be re
- Page 241 and 242:
ii)Erector having experience as men
- Page 243 and 244:
S.No.FORMAT A :Format for the Bidde
- Page 245 and 246:
On a separate page, using the follo
- Page 247 and 248:
In case bidder is a holding company
- Page 249 and 250:
(ii)Address of the Employer withE-m
- Page 251 and 252:
8.9.10.11.12.13.14.16.17.18.(D)Summ
- Page 253 and 254:
collectively, the minimum criteria
- Page 255 and 256:
ATTACHMENT-4(Form of Certificate of
- Page 257 and 258:
ATTACHMENT-5(Bought-out & Sub-contr
- Page 259 and 260:
ATTACHMENT-6A(Cost of withdrawal of
- Page 261 and 262:
ATTACHMENT-10(Guarantee Declaration
- Page 263 and 264:
ATTACHMENT-14(Check-list)Design, Su
- Page 265 and 266:
PRICE SCHEDULE-1(SUMMARY PRICE PROP
- Page 267 and 268:
PRICE SCHEDULE-2(PRICE BREAK-UP OF
- Page 269 and 270:
C. Training Charges(i) Training Cha
- Page 271 and 272:
(05%), RoadCrossing(15%).3. Optical
- Page 273 and 274:
PRICE SCHEDULE-4(PRICE BREAK-UP OF
- Page 275 and 276:
PRICE SCHEDULE-5A(SUMMARY PRICE COM
- Page 277 and 278:
(c) Others (please specify) for dir