Lectu Reservoir Capac ure 2 city Yield Analysis
Lectu Reservoir Capac ure 2 city Yield Analysis
Lectu Reservoir Capac ure 2 city Yield Analysis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Problems with Masss Diagram Method‣ <strong>Reservoir</strong> release needs tobe constant (this is notaccurate for monthly intervaal as demands are oftenseasonal)‣ Assumes that fut<strong>ure</strong> hydroloogy is like the past‣ Cannot compute storage size for a given reliability‣ Evaporation and other losses that depend on level inreservoir cannot be factoredinto analysisCVEN 5838 Aug 28, 2008